AI Infrastructure·Company·2026-09-03·60 sources·24 figures
By the numbers
$2,575mQ2 2026 revenue
$104bnRevenue backlog
$35.6bnDebt principal
9.00%Wtd-avg interest rate

§Same chips, three ways to pay for them

On 11 August 2026 CoreWeave told investors it had signed customer contracts worth about $104 billion1, held 1.5 gigawatts of active power, and lost $626 million in the quarter. Two weeks later IREN closed a fiscal year with $707.0 million2 of revenue, roughly 40 megawatts of AI capacity running, and a $702.6 million net loss driven by writing off the bitcoin miners it is tearing out. Nebius sat between them: $582.3 million3 of quarterly revenue, $8.0 billion of cash, and a $430.8 million half-year profit that came mostly from revaluing an equity stake. Three companies, one product, three completely different pictures.

All three buy Nvidia silicon at broadly the same prices and sell it on broadly the same contracts. The durable difference sits in the financing: CoreWeave pays 9.00% on $35.6 billion of debt, while IREN and Nebius pay under 2% on roughly $8 billion each.

The consensus treats these three as one trade. They are lumped together as "neocloudsA cloud company built for one workload. It buys the specialised Nvidia chips that AI models run on, puts them in a building with the power, cooling and networking they need, and rents the capacity out — usually on multi-year contracts to a small number of large customers. What it does not sell is the databases, developer tools and enterprise software that a general-purpose cloud wraps around the same hardware." (companies whose whole business is buying Nvidia chips, housing them, and renting the capacity out under contract), ranked by backlog, and discussed as though the question were which of them has the best contracts. That framing is half right and it hides the part that matters. Contract structure across the three is more similar than different — multi-year, prepaid or take-or-pay (the customer pays for the capacity it reserved whether or not it uses it), anchored on a handful of names that could build the capacity themselves. Where they genuinely differ is upstream of the contract, in what each company had to promise to raise the capital that bought the hardware. CoreWeave promised cash coupons. IREN and Nebius promised equity. Those are two different answers to the same question: who eats the loss if AI compute reprices. They produce two different companies in a downturn.

That difference decides three of the arguments that follow. It runs through the depreciation policies, which diverge enough to make reported margins non-comparable. It runs through the contract books, which cannot be compared at face value because one of the three records its largest arrangements as equipment leases rather than cloud services. And it runs through the moat question, where only one advantage in the group cannot simply be bought at today's prices.

  1. 1The funding model, not the business model, is the real differentiator. CoreWeave's disclosed weighted-average interest rate — the blended rate across everything it has borrowed, each loan counted in proportion to its size — is 9.00% on $35.6bn of principal; IREN's computed weighted average is 1.64% and Nebius's 1.91%. On current balances that is roughly $3.6bn of annual cash interest against about $155m and $126m. High
  2. 2The three contract books are not comparable as reported. CoreWeave's $103.7bn and Nebius's $37.5bn are ASC 606The US accounting standard that governs how a company recognises revenue from selling a service. It is the rule that produces the "remaining performance obligation" figure every neocloud quotes as its backlog. remaining performance obligations — signed revenue the company has not yet delivered and therefore not yet booked; IREN's headline arrangements are operating leasesA contract the accountants treat as renting out a specific asset rather than selling a service. The distinction matters here because a lease of named GPUs in a named hall is a different economic animal from a cloud subscription — and, crucially, its contracted value never appears in the RPO line that everyone compares. — $11.4bn of ASC 842The US accounting standard for leases. When a customer contract is judged to be predominantly the rental of specified equipment and space, it is accounted for under this standard instead of ASC 606, and its value sits outside the reported revenue backlog altogether. lease value plus only $5.1bn of RPO. Compare $104bn to $5.1bn and you have measured nothing. High
  3. 3The investment-gradeThe top half of the credit-rating scale — a borrower, or a promise to pay, that the rating agencies judge unlikely to default. Below it sits "high yield," where lenders demand a much higher interest rate for the same money. The label can attach to a company, to a bond, or — as this brief shows repeatedly — to a single ring-fenced pool of contracts rather than to the operator that assembled it. anchor customer is paid for in price. A customer that large and that creditworthy anchors the whole build — and lenders will finance its promise cheaply. IREN's Microsoft contract implies about $9.7m of revenue per MW of IT loadThe power actually drawn by the computers themselves, measured in megawatts, excluding what the cooling and the rest of the building consume. It has become the industry's unit of sale: capacity is quoted in megawatts of IT load, and price in dollars of annual revenue per megawatt. A site's total facility power is always the larger number, which is why the two must never be compared directly. per year — the industry's standard unit, dollars of annual revenue for each megawatt of computing power sold; IREN says recent three-year deals clear above $20m and discussions run near $25m. The cheaper funding that Microsoft's credit unlocks is worth a fraction of the price gap. Moderate
  4. 4Depreciation divergence makes reported margins un-rankable. Depreciation is the slice of a chip's purchase price charged against profit each year, and the size of the slice depends entirely on how many years the company assumes the chip will earn. CoreWeave depreciates technology equipment over six years; IREN and Nebius use five. Re-lifing CoreWeave's fleet to five years, which means re-running its accounts on the shorter clock its peers use, adds roughly $238m of quarterly depreciation and turns a $49m Q2 operating loss into about $287m. High
  5. 5IREN's power is the only advantage here that cannot be bought at today's prices. Electricity was 3.5% of its FY26 AI Cloud revenue — $4.5m against $128.8m — because grid positionsLand that comes with a signed, scheduled right to draw a stated amount of power from the electricity network. The land is the cheap part. The right to draw power is the scarce part, because utilities grant it through a queue that runs years long and cannot be jumped by paying more. (land with a signed right to draw power from the network) bought for bitcoin mining now carry a product worth roughly thirteen times more per megawatt. Moderate
  6. 6Nebius's funding advantage is a condition, not a moat. It raised $2.8bn on an at-the-market programmeA standing arrangement, usually shortened to ATM, that lets a listed company drip new shares into the open market at whatever the price happens to be that day, rather than raising a fixed sum in one announced offering. Cheap and flexible while the share price is high. It closes on its own when the price falls, because nobody wants to issue stock into weakness. (selling new shares into the open market a slice at a time) at a weighted-average $223.6 per share and $4.3bn of convertsConvertible notes: debt that pays a low interest rate because the lender also gets the right to swap it for shares if the stock rises far enough. The borrower buys a cheap coupon today and pays for it later in dilution. The low rates on IREN's and Nebius's borrowings are almost entirely this instrument. (bonds that pay a low coupon because the lender can swap them for shares) at 1.25–2.625%. Both prices are functions of its own equity price, which is exactly what a downcycle removes. Moderate
  7. 7Ranking on durable structural quality: IREN first, Nebius a close second, CoreWeave third. CoreWeave would rank first on scale and contracted revenue and does not rank first here, because at 2.9× capex-to-revenue (nearly three dollars of building for every dollar it bills) and 28% of guided 2026 revenue going to interest it is the machine with the least room to be wrong. Moderate
What this document is, and is notThis is a structural assessment of three business models over a multi-year horizon. It contains no price targets, no valuation, and no buy, sell or hold view. The ranking grades the durability of the businesses on disclosed evidence. It says nothing about any security's price.

Part I — The machines

Part I sets out what a neocloud sells and how each of the three is built to sell it. Every judgment in Part II can be checked against the evidence assembled here.

01What a neocloud actually sells

A customer who signs with CoreWeave, IREN or Nebius is reserving a physical thing, not a software subscription: a specified number of Nvidia acceleratorsThe specialised chips — GPUs, in the common shorthand — that AI models are trained and run on. They do a narrow kind of arithmetic thousands of times in parallel, which is what a neural network is made of. Nvidia designs the ones every company in this study buys, and sets their price., wired into a specified network fabricThe high-speed wiring that lets thousands of accelerators behave as one machine. A large AI job is split across the whole cluster, so every chip must exchange results with every other chip constantly; if the fabric is slow, the chips sit idle waiting. It is architecture rather than plumbing — the fabric is a large part of what a customer is actually renting., sitting in a specified building drawing a specified number of megawatts, for a specified number of years. Almost everything about the economics follows from that sentence. The asset is bought up front with borrowed or raised money. The revenue arrives monthly over the term. The gap between those two facts is the business.

Take-or-pay, backlog and RPO are the terms every table in this report is built from, and none of them means quite what it sounds like.

Take-or-pay, capacity reservation, on-demandA take-or-pay contract obliges the customer to pay for reserved capacity whether or not it uses it. A capacity reservation reserves the hardware but may allow the customer to walk if the supplier misses delivery dates. On-demand is hourly rental at a posted rate with no commitment. The first two look identical in a backlog table and behave very differently when a customer changes its mind.
Backlog, RPO, and revenueRemaining performance obligations (RPO) is the accounting measure of contracted-but-unrecognised revenue under ASC 606. Revenue backlog is a company-defined figure that may add contracts not yet meeting the RPO test. Neither is cash. CoreWeave's own definition of backlog is RPO plus "other estimated future revenue," and it states that the figure is subject to delivery and service availability1 — which is to say, subject to the supplier building the thing.

The chain from a megawatt to a monthly invoice has five links, and each of the three companies owns a different subset of them. The constraint moves down the chain as the market tightens. In 2023 it was GPU allocation. By 2026 it is power and the time it takes to energiseTo bring a site's electrical connection into live service — the substation built, the utility's approval given, current actually flowing to the racks. A site can be bought, permitted and half-built and still not be energised, which is why "secured" power and live power are different numbers, often by a factor of a hundred. it — which is why every one of the three now leads its disclosure with gigawatts rather than chip counts.

Figure 1From a megawatt to an invoice — where each link can break
  1. 01
    Land & interconnect
    A site with a signed grid connection. Queue position takes years and cannot be accelerated with money alone.
  2. 02
    The shell
    Building, cooling, electrical fit-out. Self-built or leased from a developer. The 2025 delivery failures happened here.
  3. 03
    The fleet
    GPUs, networking, storage, bought from Nvidia or an OEMOriginal equipment manufacturer — a builder such as Dell or Supermicro that assembles Nvidia's chips into finished servers and racks and sells the completed system. Buying through an OEM rather than direct changes who you pay and who finances the purchase; it does not change the chip or, much, the price. at prices no buyer controls.
  4. 04
    The platform
    OrchestrationThe software that decides which of a customer's jobs runs on which chips, when, and what happens when one fails mid-run. On a cluster of thousands of accelerators a single hardware fault can kill a training run that has been going for days; good orchestration is largely the business of making that not happen., storage, observabilityThe tools that show a customer what its jobs are actually doing inside the cluster — which chips are busy, where a run is stalling, what a failure cost. Dull, and the difference between a rented machine and a usable one., managed inferenceRunning a finished AI model to answer a request, as opposed to training, which is building the model in the first place. Training is a huge job run occasionally on a very large cluster; inference is a small job run constantly, at whatever scale the users demand. The two workloads want different hardware and different contracts, and the market is shifting toward inference as deployed models multiply.. The only layer where the three products genuinely differ.
  5. 05
    The contract
    TenorHow long a contract runs before it ends. A five-year tenor and a six-month tenor on identical hardware are different businesses: the long one is financeable and cheap, the short one is dear and has to be re-sold every few months., price per MW, prepayment, termination rights. What the lender actually underwritesTo examine a risk and agree to carry it for a price. A lender underwriting a neocloud deal is not really judging the neocloud; it is judging whether the customer at the far end of the contract will keep paying, and what the hardware would fetch if it stopped..
Evidence: IREN 10-K FY2026 Item 1 (three-layer stack description); CoreWeave 10-Q Q2 2026 MD&A (platform description); Nebius 20-F 2025 Item 4 (full-stack description).
Method: Qualitative chain assembled from the three issuers' own descriptions of what they own and operate; no quantities implied.
Synthesis: Links 1 and 2 have become the binding constraint; link 3 is a commodity purchase; link 4 is the only source of product differentiation; link 5 is what converts the first four into financeable cash flow.

Pricing sits on top of that chain and is quoted, in this market, per megawatt of IT load per year. Nebius told shareholders in August that its second-quarter deals averaged "more than $20 million in revenue per MW"4 and that it sees "a price opportunity in the $40–50 million per MW range" for short-duration capacity. IREN's August results deck puts recent three-year contracts at ">$20m revenue per MW (IT)" with "active discussions at ~$25m per MW"5. CoreWeave does not disclose a per-megawatt price at all. The largest operator in the group is the one that has chosen not to publish its unit price.

Three contract shapes now coexist, and they are converging across all three companies rather than distinguishing them. Long-dated deals with investment-grade counterparties run typically five years, priced low and used to raise cheap secured debt. Mid-length deals of one to three years go to AI labs at the market price. Short deals of three to six months carry a large premium, and have appeared at both Nebius and CoreWeave within the last quarter. CoreWeave's chief executive was explicit about why the short book matters: enterprises "tend to think in shorter cycles" than five years, and the company needed a financing structure that could support two- and three-year contracts before it could sell them. That structure arrived on 10 August 20266 as a $2.6 billion facility.

Bottom lineThe product is nearly identical across the three; the differences live one layer up, in what each company owns, and one layer down, in how each paid for it.

02The stakes, sized

All three can be set against each other on a single date. The table below is dated 3 September 2026 for market values and uses each company's most recent reported balance sheet — 30 June 2026 for all three, which happens to be a common date because IREN's fiscal year ends then.

Figure 2The three machines, sized on one date
MeasureCoreWeave (CRWV)IREN (IREN)Nebius (NBIS)
Market capitalisation, 3 Sep 2026$46.00bn$16.18bn$56.86bn
Latest quarter revenue$2,575m (Q2 CY26)$137.2m (Q4 FY26)$582.3m (Q2 CY26)
of which AI computesubstantially all$70.5m$574.9m
Contracted book (scope-normalised)$104.0bn backlog~$16.5bn (see note)$37.5bn RPO
ASC 606 RPO$103,700m$5,100m$37,490.6m
ASC 842 lease contract valuenot disclosed~$11,400mnot disclosed
Live / active power1.5 GW active~40 MW AI (plus ~380 MW mining)not disclosed
Contracted or secured power4.2 GW (11 Aug 2026)~5 GW secured5 GW target, YE 2026
Total debt principal$35,551m$7,705.7m$8,087.5m converts
Weighted-average interest rate9.00% (disclosed)1.64% (computed)1.91% (computed)
Cash and equivalents$5,524m$5,895.6m (+$1,723.9m restricted)$8,042.1m
Total equity$5,024m$4,185.6m$10,340.5m
2026 capex guidance$35–39bnnot guided; $13.8bn committed$20–25bn
2026 revenue guidance$12.4–13.2bn>$4bn exit ARRAnnualised recurring revenue: the revenue rate a business is running at in its final month or quarter, multiplied out to a full year. "Exit ARR" is that rate at the end of the period. It is a forward-looking run-rate, not money earned, and it flatters any company adding capacity fast.$3.0–3.4bn
Method: IREN's contracted book adds its $5.1bn of ASC 606 RPO to the ~$11.4bn aggregate contracted value of arrangements it accounts for as operating leases; the two are disclosed separately and are not additive in the issuer's own presentation, so the total is this report's construction. Weighted-average rates for IREN and Nebius are principal-weighted stated coupons computed from each issuer's debt note and offering releases; CoreWeave's 9.00% is disclosed. IREN's fiscal Q4 ends 30 June 2026 and is compared to the other two's calendar Q2.
Synthesis: Nebius carries the largest market value on the smallest revenue; CoreWeave carries the largest revenue and the largest debt; IREN carries the smallest of almost everything except secured power, where it is level with the other two.

Two rows in that table deserve a warning label. The contracted-book row is the one most often quoted and most often misused: CoreWeave's $104 billion and IREN's $5.1 billion are not the same measure, because IREN's largest arrangements are not service contracts at all. Its FY2026 revenue note states that the company "determined that these arrangements contain leases of specified GPU equipment and dedicated data center space," that the lease component "is predominant," and that the aggregate contracted value of lease arrangements was approximately $11.4 billion13. That value sits outside RPO entirely. Any comparison that puts $104 billion next to $5.1 billion is comparing a total to a fragment.

The power row carries the same hazard in a different form. CoreWeave's "1.5 GW active" is facility power across its footprint; IREN's "40 MW" is AI Cloud IT load specifically, alongside roughly 380 MW still drawing power for bitcoin miners it is decommissioning; Nebius does not publish a live figure at all and reports only contracted power secured by land and grid commitments. These three numbers are not measuring the same thing and should not be ranked against each other. One comparison does survive: CoreWeave has built and energised more than the other two combined, by a wide margin, and has therefore taken and survived more delivery risk.

Figure 3Latest quarter, annualised — the scale gap the growth rates hide
CoreWeave$10.30bnNebius$2.33bnIREN$0.55bn
Evidence: CoreWeave Q2 CY2026 revenue $2,575m (10-Q statement of operations16); Nebius Q2 CY2026 revenue $582.3m (Q2 2026 results release3); IREN Q4 FY2026 revenue $137.2m, of which AI Cloud $70.5m (FY26 results release5).
Method: Most recent reported quarter × 4. Red marks IREN, whose bar includes roughly $67m of bitcoin mining revenue being deliberately wound down; its AI-only annualised figure is about $0.28bn. Annualising a single quarter overstates nothing and understates a business adding capacity mid-quarter — treat as a floor, not a forecast.
Synthesis: On today's revenue, CoreWeave is roughly 4× Nebius and 19× IREN. Growth rates flatter the two smaller names; scale is where the operating leverage and the delivery record actually sit.

Who owns what is the last of these comparisons. The same GPU sits in three quite different corporate structures, and the differences show up in the balance sheet long before they reach the income statement.

Figure 4Owns, leases, or contracts — the same chain, three structures
LinkCoreWeaveIRENNebius
Land & grid connectionMostly contracted; "powered land" accumulating; first self-builds under wayOwned — land, grid connections and substations at every operating siteMixed — owned "AI factories" under construction, plus contracted sites in seven countries
Data centre shellLeased — $16.6bn of operating lease right-of-use assetsWhen a company signs a long lease, accounting rules make it put the value of what it has the right to use on one side of its balance sheet and the matching obligation to pay rent on the other. The asset is the right to occupy the building; the liability is the rent it owes. Economically the liability behaves much like debt, which is why lease books belong in any leverage comparison. on balance sheet, plus ~$35.5bn of leases signed but not yet commencedSelf-built — develops, owns and operates, including cooling designOwned, colocatedRenting space, power and cooling in someone else's data centre and filling it with your own equipment. Colocation buys speed and avoids construction risk; it also means paying a landlord a margin for the building, and depending on that landlord to finish it on time. and asset-light: partners deploy Nebius designs in their own buildings
GPU fleetOwned; part-financed by OEM and software licence financing arrangementsOwned; financed by non-recourse GPU facilities and customer prepaymentsOwned; in-house server and rack design
Platform softwareProprietary — Mission Control, LOTA storage, orchestrationThin, and bought: acquired Mirantis in August 2026 for ~$544mDeepest of the three — Aether cloud, Token Factory inference, Tavily search
Power procurementContracted capacity and prepayments; 355 MW under one prepaid access agreementGrid-connected under regulated tariffs (BC, Oklahoma) and ERCOTThe Electric Reliability Council of Texas, which runs the Texas grid as an island largely separate from the rest of the United States. Power there is bought at a market price that moves by the interval rather than at a fixed regulated tariff — cheap much of the time, violent in a heatwave or a freeze. market pricingColocation and PPAPower purchase agreement: a long contract to buy electricity from a specific generator at an agreed price, often for a decade or more. It is how a large buyer fixes its power cost in advance instead of taking whatever the market charges.-style arrangements; behind-the-meterGenerating electricity on your own side of the utility's meter, so the power never travels over the public grid and never joins the queue to connect to it. It sidesteps the interconnection wait, and it means owning and running generating equipment yourself. fuel cells with Bloom Energy from 2026
Method: Classification follows each issuer's own language. "Leased" is used only where the company recognises a lease liability or describes third-party colocation; "owned" only where the filing states ownership of land, grid connection or buildings.
Synthesis: IREN owns the most of the physical chain and the least of the software; Nebius is the reverse; CoreWeave leases the buildings it fills and is the only one of the three whose balance sheet carries a lease obligation comparable in size to its debt.

03CoreWeave — the leveraged contract machine

CoreWeave's second quarter of 2026 contains the whole argument about the company in six numbers. Revenue of $2,575 million, up 112%. Adjusted EBITDA of $1,510 million, a 59% margin. Adjusted operating income of $128 million, a 5% margin. A GAAPGenerally Accepted Accounting Principles — the audited US rulebook a company must report under. Anything labelled "adjusted" is the company's own alternative presentation, with items it considers unrepresentative taken out. Both can be honest. Only one is standardised, which is why a GAAP number and an adjusted number for the same quarter can differ by a great deal and neither is a mistake. operating loss of $49 million. Net interest expense of $640 million. A net loss of $626 million. Those are one quarter seen through six filters, and the distance between the top and the bottom is the argument. EBITDA is profit measured before the cost of the chips (depreciation) and the cost of the money (interest) are taken out. In most industries that is a fair stand-in for the cash a business throws off. Here the chips and the money are the business, so EBITDA is the one measure built to leave out what separates these three companies. The business converts most of its revenue into EBITDA and then hands nearly all of it to depreciation and lenders.

$2,575mQ2 2026 revenue
$104bnRevenue backlog
$35.6bnDebt principal
9.00%Wtd-avg interest rate
1.5 GWActive power

Sources: CoreWeave 10-Q statement of operations16, Q2 2026 results release1, debt schedule8 and debt narrative21, all as at 30 June 2026.

What it sells and to whom

CoreWeave sells a managed AI cloud rather than bare metalRenting the physical machines and nothing else: the customer gets root access to the hardware and brings its own software for everything above it. The opposite of a managed cloud, where the supplier also runs the scheduling, storage and monitoring layers. Bare metal is cheaper per chip and shifts the work, and the blame, to the customer. — networking backbone, GPU clusters, purpose-built storage with GPU-local caching, and an orchestration layer it calls Mission Control. Its Q2 2026 10-Q22 states plainly that revenue "primarily comes from committed contracts" rather than on-demand consumption. The company builds against signed commitments, not against a demand forecast.

In FY2025, a single unnamed customer was 67% of revenue23, up from 62% in 2024. By the second quarter of 2026 that customer was 36%24, with a second at 26% and a third at 10%. Concentration has genuinely fallen, and it fell because the denominator more than doubled rather than because the anchor shrank.

Figure 5CoreWeave revenue concentration, Q2 2026
36%26%10%28%Customer A — 36%Customer B — 26%Customer C — 10%All others — 28%
Evidence: CoreWeave 10-Q Q2 2026, schedule of customer concentration risk24. Customers are identified only by letter in the filing.
Method: "All others" is the residual to 100% (100 − 36 − 26 − 10 = 28). Red marks Customer B, the fastest-rising of the disclosed three, at nil a year earlier.
Synthesis: Three customers are 72% of revenue. Diversification has improved sharply in relative terms and remains extreme in absolute terms.

The filings do not name these customers. CoreWeave's S-125 lists Cohere, IBM, Meta, Microsoft, Mistral and Nvidia among the "leading AI labs and AI enterprises" using the platform, but attaches no percentage to any of them. The widespread attribution of the 67% figure to Microsoft is trade-press inference, not disclosure. What is disclosed, from both sides, is the contract book itself.

Figure 6CoreWeave's disclosed contract map
CounterpartyAnnounced valueDateTenor / structure
OpenAI (initial)up to $11.9bnMar 2025Multi-year infrastructure agreement
OpenAI (first expansion)up to $4.0bnMay 2025Expansion of the March agreement
OpenAI (second expansion)up to $6.5bnSep 2025Total OpenAI commitment ~$22.4bn
NVIDIA (backstop order form)$6.3bn initial value9 Sep 2025NVIDIA obliged to buy residual unsold capacity through 13 Apr 2032; either party may terminate on 30 days' notice of breach or on insolvency
Meta Platforms~$21bn9 Apr 2026Dedicated capacity through December 2032, multiple sites, initial Vera RubinNvidia's name for a generation of its AI hardware. The company ships a new one roughly every year — Hopper (the H100), then Blackwell (the B200 and GB200/GB300 systems), then Vera Rubin — each faster than the last. That cadence is what makes the useful life of an installed fleet an open question rather than an engineering fact. deployments
Jane Street~$6bnApr 2026Committed use of the platform
New enterprise logosnot disclosedQ2 2026Bentley Systems, Caterpillar, Grammarly, Isomorphic Labs, Sunday Robotics
Post-quarter commitments>$25bn net newearly Q3 2026Not in the $104bn backlog figure
Method: "Announced value" is the maximum stated in the announcement, not a contractual minimum; several are expressed as "up to." The Jane Street figure is from CoreWeave's April 2026 announcement and is not separately quantified in the 10-Q.
Synthesis: Only the NVIDIA order form has publicly disclosed termination mechanics. For the OpenAI and Meta agreements the market knows the headline number and not the escape hatches — the single largest information gap in the sector.

The financing, which is the business

CoreWeave has raised, by its own count on the August call, "over $32 billion of debt and equity capital secured to date." The debt schedule at 30 June 2026 runs to more than a dozen separate instruments: delayed-draw term loansA loan agreed in full up front but taken down in instalments as the borrower needs the cash — typically as each building fills with equipment. It suits a company spending money in stages, and it means the headline facility size and the amount actually borrowed are two different numbers. numbered 1.0 through 5.0, dollar senior notes with stated couponsThe interest rate printed on a bond — the cash the borrower must hand over every year for as long as the bond is outstanding, whatever the business is doing that year. Unlike a dividend, it is not optional. of 9.00%, 9.625%, 9.75% and 10.00%, euro notes at 8.50%, convertible issues at 1.75% and 2.00%, OEM and software licence financings at 9.00% and 11.00%, and a legacy Magnetar loan at 12.00%. Gross long-term debt is $35,551 million8. The disclosed weighted-average rate is 9.00%21.

Management presents the trajectory as an improving one, and on its own terms it is. The company says it has reduced its weighted-average cost of debt by "almost 300 basis pointsHundredths of a percentage point. A hundred basis points is one percent. Lenders count in them because on a balance sheet of this size a quarter of a point is real money, and saying "twenty-five basis points" leaves no room to mishear "a quarter percent" as "point two five percent."" over the past year, worth about $1.1 billion of annualised interest saving on the end-Q2 debt load. The centrepiece of that repricing closed on 31 March 202630: an $8.5 billion delayed-draw term loan rated A3A rung on Moody's credit-rating ladder, comfortably inside investment grade — roughly the standing of a solid large corporate. The ladder runs Aaa, Aa, A, Baa and then down into the speculative grades. DBRS's "A (low)" sits at about the same height on a different agency's scale. by Moody's and A (low) by DBRS, priced at SOFRThe Secured Overnight Financing Rate — the benchmark US interest rate that floating-rate loans are quoted against. "SOFR + 2.25%" means the borrower pays whatever short-term rates happen to be, plus 2.25 percentage points. The spread is the lender's judgment of the borrower; the SOFR part is the weather. + 2.25% floating or roughly 5.9% fixed, maturing March 2032 and secured by substantially all assets of a bankruptcy-remote subsidiary together with the associated customer contract. It was the first investment-grade-rated financing secured by high-performance computing infrastructure, and it is a genuine capital-markets achievement.

Ring-fencing is how the cheap debt in this sector gets raised. A company sets up a separate subsidiary, puts one customer contract and the hardware that serves it inside, and borrows against that subsidiary alone. The lenders can seize what is inside the fence and nothing beyond it; if the subsidiary fails, the parent is not on the hook. What such a lender is really buying is one customer's promise to pay, insulated from everything else the parent is doing. The A3 rating attaches to a ring-fenced vehicle — "substantially all assets of CoreWeave Compute Acquisition Co. VIII, LLC" plus the associated customer contract — and not to CoreWeave. What the parent itself pays is visible in the same debt schedule: unsecured senior notes issued at 9.00%, 9.625%, 9.75% and 10.00%, which is high-yieldThe polite name for debt rated below investment grade, and the older name is junk. Lenders charge these rates when they think default is a live possibility. The label describes the price the market demands, not a verdict on the company — but the price is the market's verdict. pricing by any reading. The structure demonstrates that a strong counterparty's payment obligation, isolated from the operating company, can be financed at investment-grade cost. That is a statement about the customer's credit and the enforceability of the contract. It is not, by itself, a statement about CoreWeave's.

Figure 7A quarter of every revenue dollar goes to lenders
Interest expense / revenue24.9%CoreWeave, Q2 2026: $640m net interest expense on $2,575m of revenue
Evidence: CoreWeave 10-Q Q2 202616: net interest expense $640m on revenue $2,575m.
Method: 640 ÷ 2,575 = 24.9%. Net of interest income and after $79m of interest capitalised into construction in progress in the quarter, so the gross funding cost is higher still. Q3 guidance of $860–940m against guided revenue of $3.45–3.60bn implies a similar ratio.
Synthesis: The interest line is now larger than the entire operating expense base of either peer. It is contractual, it grows with the build, and it does not fall if utilisation does.

Then there are the leases, which are debt in everything but name. At 30 June 2026 CoreWeave carried $16,595 million of operating lease right-of-use assets against $16,319 million of operating lease liabilities. The note discloses a further block of leases signed but not yet commenced — approximately $35.5 billion of data centre and office building obligations over sixteen-year terms17, including a single site of about $14.7 billion. None of that appears on the balance sheet until the landlord delivers. Add the on-balance-sheet leases to the debt and CoreWeave has roughly $52 billion of fixed obligations today, with another $35 billion queued behind them.

A sixteen-year lease against a six-year depreciation schedule is a bet that the building outlives four fleets of chips.
The structural question inside CoreWeave's lease book

Growth, and what has to go right

The build plan is the most aggressive of the three by a distance. Capex guidance for 2026 is $35–39 billion against revenue guidance of $12.4–13.2 billion — roughly 2.9 times revenue. Active power is guided to exceed 1.85 GW by year end, with contracted power at 4.2 GW as of 11 August and a stated target of "at least 8 gigawatts by 2030." International capacity has passed 1 GW, including 360 MW in Indonesia due online in about eighteen months.

Against that, the conversion evidence is better than the sceptics allow and worse than the headline suggests. Management disclosed that "more than 50%" of the Q2 backlog is attached to a contract where customer delivery has commenced, and expects that to reach two-thirds by year end. The RPO note is more precise: 41% of the $103.7 billion is expected to be recognised within 24 months from 1 July 2026, and a further 39% within the 48 months from 1 July 2028. So roughly $42.5 billion converts by mid-2028 and the balance stretches into the 2030s. A backlog with a weighted life that long is a portfolio of long-dated obligations, not a forward order book in the ordinary sense. Its value depends on counterparties still wanting the capacity in 2031.

CoreWeave raised prices roughly 25% across SKUsStock-keeping units — the distinct products on a price list. Here each SKU is a particular configuration of chips, memory and networking rented by the hour. A price rise "across SKUs" means the whole menu moved, not one line of it. in July 2026 "in response to the current demand environment," and says it remains "largely sold out of prior generations of NVIDIA GPUs in addition to the current SKUs." If that holds through a cycle it is the strongest evidence yet against the residual-valueWhat a GPU is still worth once its first contract has run out — whether it can be re-let, and at what price, or sold second-hand. Nobody knows yet: no operator has taken a large modern fleet through a full contract term and remarketed it. Lenders nonetheless have to put a number on it, because residual value is a large part of what secures the loans this sector runs on. bear case, and it belongs in the ledger alongside the leverage.

Structural read on CoreWeave: the best contract book in the group, attached to the least forgiving balance sheet.
  • Weighted-average cost of debt falling below roughly 6% while gross debt stops compounding would materially change the read — management has already taken it down ~300bp in a year.
  • Two consecutive quarters of positive GAAP operating income at the current six-year depreciation schedule would show the model clears its own capital cost.
  • A second investment-grade-rated facility against a non-Meta customer contract would show the structure generalises beyond one counterparty's credit.
  • Conversely: a large customer failing to renew at term, or a repeat of the 2025 third-party data centre delivery failure, would hit revenue and covenant headroom at the same time.

04IREN — the power company that learned to sell compute

IREN spent $186.6 million on electricity in the year to 30 June 2026 to run bitcoin miners that produced $578.2 million of revenue. In the same year it spent $4.5 million on electricity to run an AI cloud that produced $128.8 million. Power was 32% of the cost of one product and 3.5% of the other. That single pair of numbers, from the cost of revenue note31 in its FY2026 10-KA US-listed company's annual report to the Securities and Exchange Commission — the audited, legally binding account of the year, and the most reliable document any issuer produces. Its relatives appear throughout this brief: the 10-Q is the quarterly version, the 8-K a one-off disclosure of a material event, and the 20-F and 6-K the equivalents filed by foreign issuers such as Nebius. Press releases and investor decks are none of these., explains the entire strategic pivot and most of what makes IREN interesting.

$707.0mFY2026 revenue
$128.8mof which AI Cloud
~5 GWPower secured
~40 MWAI capacity operating
1.64%Wtd-avg interest rate

Sources: IREN FY2026 10-K statement of operations2, FY26 results release5, 10-K Item 118, and rate computed from the debt note12.

The asset nobody was bidding for

Between 2021 and 2024 IREN acquired land and grid connections in places chosen for cheap renewable power and indifferent competition: Canal Flats, Prince George and Mackenzie in British Columbia; Childress in the Texas panhandle; later Sweetwater, Kiowa in Oklahoma, Bundey in South Australia. Bitcoin mining paid for the option. As of 30 June 2026 the company reports "executed grid connection agreements, letters of agreement or equivalents representing approximately 5GW of total power capacity18" across the United States, Canada, Spain and Australia, with announced site capacities of 1,600 MW at Kiowa, 1,400 MW at Sweetwater 1, 800 MW at Bundey, 750 MW at Childress and 600 MW at Sweetwater 2.

The word "equivalents" is doing real work in that sentence and should not be waved past. A letter of agreement is not an energised substation. IREN's own operating footprint tells the truth about the gap: roughly 40 MW of AI Cloud capacity and about 380 MW still running miners at year end, against a 5 GW paper portfolio. The distance between those numbers is the company's entire execution risk.

Where the power already flows, the numbers are clear. Strip out depreciation and IREN's AI Cloud segment ran at an 86.9% gross margin in FY2026 — $128.8 million of revenue against $16.9 million of electricity, employee and other direct costs. Nebius, on the same pre-depreciation basis, ran at 77.1% in the June quarter. CoreWeave's 65.9% is not directly comparable because its cost of revenue line includes depreciation of power installation and distribution systems, which the other two report separately. The ranking of the three on this measure gives the order, not the size of the gaps, and it points the same way as everything else about IREN's power.

Figure 8What cheap power looks like on the income statement
AI Cloud electricity / AI Cloud revenue3.5%IREN, FY2026: $4.5m of electricity against $128.8m of AI Cloud Services revenue
Evidence: IREN FY2026 10-K, cost of revenue note31: AI Cloud Services electricity $4.5m; segment revenue $128.8m from the FY26 results release5.
Method: 4.5 ÷ 128.8 = 3.5%. Excludes depreciation, which is reported separately. The comparable bitcoin-mining ratio is 186.6 ÷ 578.2 = 32.3%.
Synthesis: The same megawatt earns roughly thirteen times more selling GPU hours than selling hashrate. That ratio, not the absolute power price, is why the pivot is rational — and why a GPU price collapse would have to be severe before mining looked better again.

The contract book, and what it is made of

IREN's commercial breakthrough was the Microsoft agreement announced on 3 November 202532: approximately $9.7 billion over five years, including a 20% prepayment, for NVIDIA GB300 capacity deployed in four 50 MW liquid-cooledCooling the chips by running coolant directly over them rather than blowing cold air through the room. The newest Nvidia systems draw too much power per rack for air to carry the heat away, so liquid cooling is what lets a hall be packed densely. It also means a different building, and a costlier one, than an air-cooled site. halls at Childress. IREN simultaneously agreed to buy the GPUs and ancillary equipment from Dell for about $5.8 billion. The first hall, Horizon 1, was delivered to and accepted by Microsoft in August 202633, with the remaining three targeted for the fourth quarter.

Then, on 7 May 202634, a second anchor: a $3.4 billion five-year AI cloud contract with NVIDIA itself for air-cooled Blackwell systems inside about 60 MW at Childress, alongside a strategic partnership contemplating up to 5 GW of NVIDIA DSX-aligned infrastructure and a five-year right for NVIDIA to purchase up to 30 million IREN shares for about $2.1 billion, conditioned on delivery of up to 600,000 GPUs. By the August results, IREN listed Cohere, Prometheus, Perplexity, Figure AI, Fal AI, Higgsfield AI, Together AI, Fluidstack, Fireworks AI and Hume AI among newer counterparties, plus an unnamed "leading frontier AI lab," and said 2026 capacity was "largely sold out."

IREN's revenue note states that these arrangements "contain leases of specified GPU equipment and dedicated data center space," that the lease component "is predominant," and that they are therefore classified as operating leases under ASC 842. Only the non-lease services element runs through ASC 606. The consequence is that IREN's disclosed RPO of $5.1 billion excludes its largest contracts, whose aggregate contracted value of approximately $11.4 billion is disclosed separately.

This is not an accounting quibble. A contract classified as a lease of specified equipment is, economically, a lease of specified equipment. The customer has taken the hardware; the differentiation IREN claims from owning "all three layers of the stack" does not obviously reach the layer the anchor customer is paying for. IREN acquired Mirantis in August 2026 for approximately $544 million precisely to thicken that software layer — an admission, in the form of a cheque, that it was thin.

The price of an investment-grade customer

Two disclosures belong side by side. The Microsoft contract is $9.7 billion over five years across 200 MW of IT load. That is $9.7 million of revenue per MW per year. The August results deck says recent three-year contracts clear ">$20m revenue per MW (IT)" with discussions "at ~$25m per MW." Nebius reported the same range for its own second-quarter deals.

Figure 9Annual revenue per MW of IT load — the anchor discount, quantified
$9.7Microsoft, Nov-25$25In discussion$20Recent 3-yr (floor)
Evidence: Microsoft point derived from the 3 November 2025 contract release32 ($9.7bn / 5 years / 200 MW IT). Upper points from IREN's FY26 results release5: "Recent 3-year contracts >$20m revenue per MW (IT)" and "Active discussions at ~$25m per MW."
Method: 9,700 ÷ 5 ÷ 200 = $9.70m per MW-year. The $20m figure is a disclosed floor, not a point estimate, and is plotted as such. Three confounds are material: the Microsoft deal was signed nine months earlier in a cheaper market, its five-year tenor would normally price below a three-year, and rack density differs by GPU generation and cooling type. All three cut in the same direction and none is quantified by the issuer. The comparison is bounded rather than precise; the direction is not in doubt.
Synthesis: Even allowing generously for tenor and timing, the investment-grade anchor is paying materially less per megawatt than the market now clears. The credit quality that makes the contract financeable is bought with price.

The cost side of the same contract is derivable, which is rare in this sector. IREN agreed to buy the GPUs and ancillary equipment for the Microsoft deployment from Dell for approximately $5.8 billion, against 200 MW of IT load — $29.0 million of GPU capital cost per megawatt. Set that against $9.7 million of annual revenue per megawatt and the GPU spend alone takes three years of contract revenue to return, before the data centre, before operating costs and before interest, on a five-year contract. At the $20 million per megawatt that newer three-year contracts clear, the same GPU cost returns in about eighteen months. That arithmetic is the whole reason IREN's management describes recent deals as carrying roughly a two-year payback and Nebius describes its own second-quarter deals at "1 year and 10 months." It is also why the Microsoft contract, taken alone, is a much thinner piece of business than its headline value suggests. A further Dell purchase of approximately $1.6 billion was agreed in May 202633; the filing does not state the megawatts it serves, so no second per-megawatt figure is computed here.

The trade is explicit in IREN's own financing disclosure. The Microsoft deployment is funded by "$3.6bn investment grade GPU financing for Microsoft contract at 6.0%," which together with prepayments covers 96% of the associated GPU capex. The non-investment-grade deployments at Mackenzie are funded by "$2.4bn financing led by Blue Owl and Pacific Investment Management Company LLC ... at a 9.0% fixed rate," covering 90% of capex. The credit spread IREN saves on Microsoft is 300 basis points on $3.6 billion — about $108 million a year.

Set that against the revenue gap. Two hundred megawatts at $9.7 million versus a market that now clears above $20 million is roughly $2 billion a year of foregone revenue at today's prices. Even discounting heavily for the nine-month gap and the longer tenor, the funding saving recovers a small fraction of it. The lesson generalises beyond IREN. An investment-grade anchor is a financing instrument, and the market charges for it in price. That cuts against the standard reading of these deals as unambiguous validation.

The balance sheet

IREN's debt at 30 June 2026 was $7,705.7 million of principal in two clearly separated buckets. The split matters more than the total. Recourse debt is borrowed by the parent company itself, and a lender who is not repaid can pursue everything the company owns. Non-recourse debt is borrowed inside one of the ring-fenced vehicles described above, and that lender's claim stops at the equipment and the contract sitting behind the fence. A balance sheet adds the two together. They behave nothing alike in a bad year. Recourse debt of $6,745.7 million is almost entirely convertible notes: $3,000m at 1.00% due December 2033, $1,150m at 1.00% due June 2033, $1,150m at 0.25% due 2032, $1,000m at 0.00% due 2031, $233.4m at 3.50% due 2029 and $212.3m at 3.25% due 2030. Principal-weighted, that is a 0.88% cash coupon. Non-recourse debt of $938 million takes the blended figure to 1.64%. It is a delayed-draw facility at 7.12% effective and US private placement notesBonds sold directly to a handful of institutions — insurers and pension funds, mostly — instead of being offered publicly. The buyers hold to maturity and negotiate tighter terms; the borrower avoids a public issue and the disclosure that comes with it. There is no traded price, so the market never marks the debt in public. at 7.05% effective, both secured by GPUs and infrastructure with debt-service-coverage covenantsA promise, written into the loan, that the cash the financed assets generate will stay above an agreed multiple of the payments owed on them. Fall below it and the lender gains rights: cash can be trapped inside the vehicle, distributions to the parent stopped, and the loan declared in default. Covenants are how a lender acts on a deteriorating position before a payment is actually missed.. Total interest expense for the whole fiscal year was $46.6 million12.

The price of that cheapness is dilution, and it has been severe. Dilution is what it costs to raise money by printing shares instead of borrowing. The company is worth what it was worth a moment earlier, but that value is now split among more owners, so each existing share is a claim on a thinner slice. Nothing about it appears as an expense on the income statement. The bill goes straight to the shareholder, in full, and it does not reverse. Weighted-average shares went from 99.6 million in FY2024 to 214.6 million in FY2025 to 316.1 million in FY2026, with 394.1 million outstanding by the August filing date — very nearly four times the FY2024 base in two years. Convertible holders sit above that with claims on a further several hundred million shares. IREN's shareholders have funded this build; they have simply done it through the share count rather than the interest line.

Nearly all of IREN's committed spending comes due inside a year. Capital commitments at 30 June 2026 were $13,810.0 million, of which $13,611.0 million falls within twelve months35, against $7,619.5 million of cash and restricted cash. IREN's own framing is that it is "well capitalized with existing cash and committed GPU financing and prepayments of $14bn," which closes the gap arithmetically — provided the committed financings draw and the prepayments arrive on schedule. Both are conditional on delivering capacity. The fault line in this machine is execution, not solvency.

Structural read on IREN: the best cost position and the cheapest capital in the group, attached to the least-proven delivery record.
  • Delivering Horizons 2–4 to Microsoft in Q4 2026 and energising the 2027 sites on schedule would convert a paper portfolio into a demonstrated one.
  • A second contract at or above $20m per MW with a non-anchor customer would show the pricing power is the company's and not the moment's.
  • Conversely: a slip in the 2027 build, or a failure of the $2.4bn Blue Owl facility to draw, turns a $13.6bn twelve-month commitment into a funding problem rather than a scheduling one.
  • A sustained fall in ERCOT wholesale power prices would erode the relative advantage of owning grid positions bought cheaply — the moat is a spread, not an absolute.

05Nebius — the software company with a balance sheet

Nebius sold 12.7 million of its own shares into the market in the first half of 2026 at a weighted-average price of $223.60, raising about $2.8 billion, and issued $4.34 billion of convertible notes at coupons of 1.25% and 2.625%. It also expects to collect more than $9 billion of customer prepayments during 2026. That is how a company with $582 million of quarterly revenue funds $20–25 billion of capital spending without a syndicated loan book. It is elegant, and it works precisely as long as the share price and the prepayment culture both hold.

$582.3mQ2 2026 revenue
$3.0bnARR, end June 2026
$37.5bnRPO
$8.0bnCash
49.7%AI cloud adj. EBITDA margin

Sources: Nebius Q2 2026 results release3, interim financial statements14 and shareholder letter4, all 12 August 2026.

A different product, sold to a different mix

Nebius came out of the Yandex separation with engineers rather than land. Its 2025 Form 20-F20 describes designing servers and racks in-house, building the orchestration software, and running "one of the few global, at scale, multi-tenant clouds purpose built for AI." The distinction from bare-metal rental is real: multi-tenantOne physical cluster serving many separate customers at once, each isolated from the others and each able to take as much or as little as it needs. The alternative is single-tenant: a hall of machines handed over whole to one customer. Multi-tenancy is harder to build and is what allows a supplier to sell to hundreds of small buyers rather than to five large ones. provisioning "from a single node to thousands of nodes" is a different engineering problem from handing a customer a dedicated hall. It is why Nebius can serve hundreds of small customers alongside its anchors.

That shows up in the concentration data. In the June 2026 quarter Nebius's three disclosed customers were 24%, 21% and 14% of revenue, leaving 41% outside the top three. A year earlier two customers had been 39% and 15%. The identity of the top customer changed entirely between the two periods — the filing's Customer A and B of 2025 do not appear in 2026, replaced by C, D and E. A customer base that rotates at the top is a different risk profile from one anchored on a single name, and on balance a healthier one.

Figure 10Nebius revenue concentration, Q2 2026
24%21%14%41%Customer C — 24%Customer D — 21%Customer E — 14%All others — 41%
Evidence: Nebius Q2 2026 interim financial statements, customer concentration disclosure14. Customers are identified only by letter.
Method: "All others" is the residual to 100% (100 − 24 − 21 − 14 = 41). Red marks Customer D, which is also 16% of receivables at 30 June 2026.
Synthesis: Top-three concentration of 59% against CoreWeave's 72%, with a top customer 12 points lower. The lettered customers of a year earlier no longer appear, so this is churn at the top rather than a stable pyramid.

The two anchors, and their terms

On 8 September 202536 Nebius disclosed a five-year Microsoft agreement with "total contract value ... about $17.4 billion through 2031," rising to about $19.4 billion if Microsoft takes optional additional services, with GPU services "deployed in several tranches during 2025 and 2026" at a new data centre in Vineland, New Jersey. The same 6-K discloses the termination mechanics, and they are the most informative sentences either side has published about how these contracts actually work: Microsoft may terminate individual GPU services if Nebius fails to meet agreed delivery dates, after a grace period, and cannot provide alternative capacity. Either party may terminate for material breach with a sixty-day cure, or on insolvency.

CoreWeave's 2025 delivery failures showed what a clause like that is for. These are delivery-conditioned commitments rather than unconditional take-or-pay obligations, and the condition runs against the supplier. A neocloud that misses a hall does not merely lose margin; it hands the customer an exit. By August 2026 Nebius reported it had "delivered all capacity tranches to Microsoft under the contract, including two tranches over the past month" — the condition has been met so far, and the fact that management chose to say so tells you how closely it is watched.

The second anchor is larger. On 16 March 202637 Nebius announced a five-year Meta agreement: $12 billion of dedicated capacity committed, plus a Meta commitment to purchase additional capacity across upcoming clusters "up to a total of $15 billion," for a contract value of up to approximately $27 billion, on the NVIDIA Vera Rubin platform, delivering from early 2027. It followed a roughly $3 billion Meta agreement signed the previous autumn. As of August the buildout supporting the second Meta agreement was "on track to come online in early 2027."

Total disclosed customer commitments are "more than $40 billion," against $37.49 billion of RPO at 30 June 2026, of which 36% is expected to be recognised in the 24 months to June 2028 and 40% in months 25 to 48. The book is younger than CoreWeave's and converts on a similar clock.

Figure 11Quarterly revenue — the growth rate and the gap are both true
01,3002,600Q1'25Q2'25Q3'25Q4'25Q1'26Q2'26CoreWeaveNebius
Evidence: CoreWeave: Q3 2025 $1,364.7m and 9M 2025 $3,559.1m from the Q3 2025 10-Q38; FY2025 $5,131m from the FY2025 10-K39; H1 2025 $2,194m and H1 2026 $4,653m with Q2 2026 $2,575m from the Q2 2026 10-Q16. Nebius: Q2 2025 $105.1m, H1 2025 $156.0m, Q2 2026 $582.3m, H1 2026 $981.3m from the Q2 2026 release3; Q3 2025 $146.1m and 9M 2025 $302.1m from the Q3 2025 release40; FY2025 $529.8m from the 2025 Form 20-F41.
Method: Quarters not separately disclosed are derived by subtraction from disclosed cumulative periods — CoreWeave Q1'25 = 2,194 − 1,212 = 982; Q4'25 = 5,131 − 3,559 = 1,572; Q1'26 = 4,653 − 2,575 = 2,078. Nebius Q1'25 = 156.0 − 105.1 = 50.9; Q4'25 = 529.8 − 302.1 = 227.7; Q1'26 = 981.3 − 582.3 = 399.0. Linear axis, $0–2,600m. IREN is omitted: its fiscal quarters do not align and its revenue is still majority bitcoin mining.
Synthesis: Nebius grew 454% year over year and remains one-fifth of CoreWeave's size. Both statements matter; a chart that shows only the growth rate would mislead about who has actually built.

Where the profit comes from, and where it doesn't

Nebius's income statement needs reading twice. Group adjusted EBITDA of $236.2 million in the June quarter was a 41% margin, against a $21.0 million loss a year earlier; the AI cloud business on its own delivered $285.7 million and a 49.7% margin. Cost of revenue fell from 29% to 23% of revenue as colocation and lease costs were spread over more capacity. That is real operating leverageWhat happens when a business's costs are largely fixed: once revenue passes the level that covers them, most of each additional dollar drops through to profit. It works ferociously in both directions, which is why a business with heavy fixed costs looks brilliant while it is filling and brutal while it is emptying. in a business that had none twelve months ago.

The headline net income of $430.8 million for the half is a different animal. Nebius's 2025 accounts show the same pattern at annual scale: a $611.7 million loss from operations rescued by a $598.9 million "gain from revaluation of investments." The equity stakes in ClickHouse — which raised at a reported ~$15 billion valuation in January 2026 — and Toloka are genuine assets and genuine optionality. They are not compute earnings, and a reader who takes the net income line as evidence that renting GPUs is profitable has been misled by the arithmetic rather than by the company.

The capital plan is the largest relative to revenue in the group. Capex guidance of $20–25 billion against revenue guidance of $3.0–3.4 billion is roughly seven times revenue, against CoreWeave's 2.9 times. Nebius has three answers. Prepayments: roughly 70% of Q2 deals included them, covering 50–60% of associated capex, with more than $9 billion expected in 2026. Secured debt: a first $775 million facility in July 2026 at SOFR + 2.50%, backed by deployed GPU infrastructure and the contracted cash flows of an investment-grade customer. And equity, in every available form — the ATM, the converts, and a $2 billion prefunded warrantA right to buy shares where the buyer pays almost the whole price now and a token amount later on exercise. In practice the company has the cash immediately and the shares are issued at a time of the holder's choosing. It is equity raised today, counted in the share tally tomorrow. issued to NVIDIA. In August 2026 it priced a further $5.0 billion of convertible notes, partly to exchange the 2029 and 2031 issues.

The fourth answer is the one Nebius says least about. Nebius introduced an "asset-light partnership model" in the June quarter under which partners build and own the data centres to Nebius specifications while Nebius supplies the software, systems architecture and demand. If that works at scale it changes the company's capital intensity fundamentally — it would be selling the platform layer while someone else carries the fleet. It is early, unquantified, and the largest source of upside optionality in this study.

Structural read on Nebius: the widest funding menu and the deepest software layer, resting on a capital plan seven times its revenue.
  • The asset-light model producing disclosed, material revenue with a named partner would demonstrate the software layer can earn without the balance sheet.
  • Sustained AI-cloud adjusted EBITDA margin near 50% while ARR passes $7bn would confirm the operating leverage is structural rather than a first-fill effect.
  • Conversely: a sustained fall in the share price would close the ATM and the convert window at once, and the $20–25bn capex plan has no committed loan book behind it.
  • A Microsoft delivery miss under the disclosed termination clause would remove a tranche of the anchor contract without any breach on the customer's side.

06The funding stacks compared

Three companies bought roughly the same asset with money that costs three very different amounts. CoreWeave's disclosed weighted-average interest rate at 30 June 2026 was 9.00%. Computed on the same principal-weighted basis from their own debt notes and offering documents, Nebius pays 1.91% and IREN 1.64%. On the balances outstanding that is about $3.6 billion of annual cash interest at CoreWeave against roughly $155 million and $126 million.

Figure 12The price of the money
CoreWeave9.00%Nebius1.91%IREN1.64%
Evidence: CoreWeave 9.00% disclosed in the Q2 2026 10-Q debt narrative21. IREN computed from the FY2026 10-K debt note12. Nebius computed from its June 2025 private placement42, its September 2025 Form FWP43 and its March 2026 closing release44.
Method: Principal-weighted stated coupons. IREN: recourse $6,745.7m at 0.881%, non-recourse $938m at ~7.09% effective, blended 1.638% on $7,683.7m of rated principal. Nebius: $500m @2.00%, $500m @3.00%, $1,375m @1.00%, $1,375m @2.75%, $2,587.5m @1.25%, $1,750m @2.625% = 1.915% on $8,087.5m. CoreWeave's figure is the issuer's own and is not recomputed here. Stated coupons understate the economic cost of a convertible, which also transfers an equity option — see the dilution row in Figure 13.
Synthesis: A 7-point spread on comparable assets decides which of these businesses can absorb a bad year and which must keep growing to service its capital structure.

The gap is a currency story, and reading it as one about credit quality misses the mechanism. CoreWeave raised the money as debt because it had contracts and no equity market to speak of when it needed the capital most; it went public in March 2025 with the debt already in place. IREN and Nebius raised the money as equity and equity-linked paper because their share prices allowed it. The result is that CoreWeave's shareholders own a levered claim on the contracts and its lenders take the first loss, while IREN's and Nebius's shareholders have already taken the loss in dilution and hold an unlevered claim on the same assets.

Figure 13Three funding stacks, at 30 June 2026
LayerCoreWeaveIRENNebius
Secured / structured debtDDTL 1.0–5.0, OEM and software licence financings and the Magnetar loan: ~$18.9bn of the $35.6bn total, at stated rates from 4.50% to 15.00%; DDTL 4.0 rated A3 / A (low) at SOFR+2.25%$938m drawn of a ~$3.6bn GPU facility (DDTL at SOFR+2.25%; USPP at 5.96% fixed), secured by GPUs and infrastructure$775m closed July 2026 at SOFR+2.50%, backed by deployed GPUs and an IG customer's cash flows
Unsecured notes$2,000m 10.00% 2030; $1,750m 9.00% 2031; $2,750m 9.75% 2031; $1,250m 9.625% 2032; €2,000m 8.50% 2032nonenone
Convertibles$2,588m due 2031 (2.00% effective); $4,000m 1.75% due 2032$6,745.7m across six series, 0.00%–3.50%$8,087.5m across six series, 1.00%–3.00%; a further $5.0bn priced August 2026
Equity issuedIPO Mar 2025 ($1,491m); $2,982m of private placements in H1 2026 including $2,000m to NVIDIA at $87.20Serial follow-ons; 837,424 shares for Nostrum, 12.6m shares for Mirantis$2,846.7m ATM at $223.60 average; $2,000m NVIDIA prefunded warrants
Customer prepaymentsDeferred revenue $9,692mDeferred revenue $1,842.5m; prepayments 45–55% of GPU capex>$9bn expected in 2026; ~70% of Q2 deals prepaid, covering 50–60% of capex
Operating cash flow, latest half$3,663m (H1 2026)not separately guided$2.3bn positive, per management
Committed / guided capex$35–39bn (2026)$13,810m committed, $13,611m within 12 months$20–25bn (2026)
Cash on hand$5,524m (+$1,380m restricted)$5,895.6m (+$1,723.9m restricted)$8,042.1m
Share count growthWeighted average +54% year over year (349.7m → 539.9m, H1'25 → H1'26)Weighted average 99.6m (FY24) → 316.1m (FY26); 394.1m outstanding302.6m weighted diluted, H1 2026; 274.1m shares outstanding across three classes
Method: CoreWeave's weighted-average share counts are derived from disclosed net loss and per-share figures (605 ÷ 1.73 = 349.7m; 1,366 ÷ 2.53 = 539.9m). Deferred revenue is the sum of current and non-current balances. Facility rates are as stated in each issuer's note; several CoreWeave facilities carry both a stated and an effective rate and the stated rate is used. CoreWeave's structured-debt subtotal is a residual: $35,551m of gross debt less the seven separately identified note issues ($2,000m + $1,750m + $2,750m + $1,250m + $2,279m + $2,588m + $4,000m = $16,617m) leaves $18,934m across the term-loan and vendor-financing instruments; the schedule does not present a clean drawn balance per facility.
Synthesis: CoreWeave's stack is built from more than a dozen instruments at a 9.00% average cost; the other two are built from convertible paper and shareholders. All three lean heavily on customer prepayments, which is the one financing technique the whole sector has adopted at once.
Figure 14Annualised cash interest on debt outstanding
CoreWeave$3,600mNebius$155mIREN$126m
Evidence: CoreWeave Q3 2026 interest expense guidance of $860–940m from the Q2 2026 earnings call10. IREN and Nebius from the computed rates in Figure 12 applied to principal outstanding at 30 June 2026.
Method: CoreWeave = guidance midpoint $900m × 4. Nebius = $8,087.5m × 1.915%. IREN = $7,683.7m × 1.638%. IREN's figure rises to roughly $534m once the $3.6bn Microsoft facility and the $2.4bn Blue Owl facility are fully drawn — that pro-forma is used in the stress test in section 12, not here.
Synthesis: CoreWeave's cash interest is roughly thirteen times the other two combined. On guided 2026 revenue it absorbs about 28% of every dollar the company bills.

Non-recourse structures move risk; they do not delete it. CoreWeave's $3,663 million of non-recourse debt and IREN's $938 million sit in vehicles whose lenders can take the GPUs and the contract but cannot reach the parent. That is genuinely protective for equity holders in a bad scenario, and it is exactly why lenders demand debt-service-coverage covenants and, in IREN's case, "restrictions on indebtedness and distributions" at the vehicle level. The parent keeps the downside optionality and gives up the cash-flow flexibility. In a normal cycle nobody notices. In a downcycle, cash trapped in a covenanted vehicle is cash the parent cannot use to fund the next build.

07The depreciation clock

How many years a GPU earns is the number underneath every argument about neocloud profitability. A company that buys a chip does not charge the whole purchase to one year. It spreads the cost over the years it expects the chip to earn, and each year's slice is depreciation. No cheque is written for it; the cash left when the hardware was bought. What makes it worth arguing about is that the assumed life is an estimate made by management. Stretch it by a year and every future depreciation charge shrinks and every future reported profit grows, with nothing at all happening inside the business. The three companies have picked different answers, and two of the three have moved their answer in the direction that raises reported profit.

CoreWeave depreciates technology equipment over six years. Its FY2025 10-K records that "effective January 1, 2023, the Company changed its estimate of the useful life for its computing equipment utilized in data centers from five to six years," citing "continuous advancements in hardware performance, software optimization, and data center design improvements." IREN depreciates GPU hardware over five years on a straight-line basisCharging the same amount every year of an asset's assumed life — a fifth of the cost a year over five years. The simplest method, and the one all three companies here use. It assumes a chip loses value at an even rate, which is a convention rather than an observation.. Nebius uses five years for server and network equipment, "up from the four-year useful life used prior to 2026" — a change made effective January 2026 that reduced first-half depreciation by $86.1 million and increased net income by $75.7 million.

Figure 15Three clocks, and what they are worth
CoreWeaveIRENNebius
Useful life, GPU/server6 years5 years5 years
Prior life and change5 years until 1 Jan 2023no disclosed change4 years until 1 Jan 2026
Disclosed effect of the change−$20m total expense in FY2023n/a−$86.1m depreciation, +$75.7m net income in H1 2026
Latest-period depreciation$1,400m (Q2 2026)$417.7m D&A (FY2026)$259.7m D&A (Q2 2026)
Normalised to 5 years+$238m per quarter; Q2 operating loss $49m → ~$287m; net loss $626m → ~$864mno changeno change
Normalised to 6 yearsno change−$68m per year on the GPU book−$57m per half; H1 net income $431m → ~$488m pre-tax
Method: CoreWeave: technology equipment was $20,903m of $24,565m of depreciable gross PP&E at 31 Dec 2025, or 85.09%; applying that share to $1,400m of Q2 2026 depreciation gives $1,191m on technology equipment, which at a five-year life becomes $1,429m, a $238m increase. This assumes the mix was unchanged at 30 June 2026. Nebius: the disclosed $86.1m saving from moving 4→5 years implies server depreciation of $430.5m at four years, $344.4m at five and $287.0m at six, so a further move to six years would save $57.4m per half. IREN: $2,030m of GPU hardware at five years is $406.0m a year versus $338.3m at six, a $67.7m difference. All figures pre-tax.
Synthesis: The policy gap is worth roughly $950m a year of reported pre-tax income to CoreWeave relative to its two peers' schedules. Adjusted EBITDA is unaffected, which is precisely why the sector talks in EBITDA.

The obvious reading is that CoreWeave is the aggressive one. That reading is too quick. CoreWeave made its change in January 2023, before the current cycle and before it was a public company with an earnings line to defend; Nebius made its change in January 2026, in the middle of the boom, and disclosed a benefit worth 18% of its half-year net income. Neither is evidence of bad faith. Both are evidence that the useful life of an AI accelerator is a judgment rather than a fact, and that three companies looking at the same hardware and the same customers reached three different judgments within a three-point range.

The argument that matters is physical rather than accounting. Michael Burry's November 2025 claim — that the realistic economic life is two to three years and that the industry's schedules understate depreciation by more than $176 billion across 2026–202850 — rests on the premise that Nvidia's annual product cadence makes older silicon uneconomic well before six years. The supporting evidence offered is resale: H100 systems reportedly trading at less than half the price of new ones by year three. Nvidia's stated counter is that "customers consistently use four-to-six-year depreciable lives based on observed utilization and longevity." CoreWeave's management gave the counter-evidence directly on the August call: the company remains "largely sold out of prior generations of NVIDIA GPUs in addition to the current SKUs," and describes a re-contractingLetting the same hardware again once its first contract expires. It is the moment the whole sector's economics get tested: the chips are older, the debt that bought them may be repaid, and the price is whatever the market will pay that day rather than what it paid years earlier. No large fleet has been through it yet. economics in which "when an initial contract ends, the cluster no longer has any leverage and we are free to recontract." That is a testable claim, and so far the test is passing — an operator with 1.5 GW live and a July price increase of about 25% is not a company struggling to fill old racks.

The answer sits between the two. The bear case is about the second half of the asset's life, and no operator has yet reached it at scale with Hopper- or Blackwell-class hardware. What can be said now is narrower: reported operating margins across these three are not comparable without the adjustment in Figure 15, and the group is one restatement away from re-ranking on GAAP profitability. Anyone ranking these businesses on reported operating income is measuring an accounting choice.

Bottom lineNormalise the clocks and CoreWeave's small operating loss becomes a large one, while nothing at IREN or Nebius moves — the gap is in the policy, not the machines.

08The customer's alternative, and everyone's incentives

In March 2025 Microsoft chose not to exercise a nearly $12 billion option to buy more data-centre capacity from CoreWeave. Semafor reported it51 as "a sign that big tech companies are starting to right-size and tailor their AI budgets," and noted that OpenAI picked the contract up. CoreWeave said publicly that there had been no cancellations. Both can be true — an unexercised option is not a cancelled contract — and the episode shows what the customer's alternative actually is. Microsoft's alternative was to not buy. That is always available, it costs nothing, and it is the ceiling on every neocloud's pricing power at renewal.

The demand side has three tiers and they behave differently. HyperscalersThe handful of companies that operate computing at planetary scale and build their own data centres to do it — Amazon, Microsoft, Google, Meta. They are simultaneously the neoclouds' largest customers, their most credible competitors, and the benchmark their prices are measured against. Every contract in this brief is signed with a counterparty that could, given time, build the same capacity itself. buy neocloud capacity to cover a shortfall against their own build, which makes the contract a hedge on their own construction schedule. AI labs buy because they cannot build fast enough and are capital-constrained in a different way — OpenAI's roughly $22.4 billion of CoreWeave commitments exist because compute arrives faster from a specialist than from a construction programme. Enterprises are the newest tier and, on the disclosed pricing, the most attractive: shorter contracts at higher rates. CoreWeave's ability to sell into that tier depended on a financing structure that only arrived in August 2026.

Oracle closed its fiscal 2026 with remaining performance obligations that "ended the quarter at $638 billion, up 363% USD year-over-year"52 on cloud infrastructure revenue of $18.1 billion. That is six times CoreWeave's backlog, at a company with an investment-grade balance sheet and a decades-old enterprise sales channel. Any moat claim for a neocloud has to survive the observation that a general-purpose incumbent booked more AI infrastructure commitments in one year than all three of these companies have booked in their existence.

Figure 16Who wants what — the incentive map
NVIDIASupplier · investor · customer
CoreWeave stake47.2m shares, $4.70bn
Nebius stake1.19m shares, $329m
IREN rightup to 30m shares / $2.1bn
As customer$6.3bn CRWV backstop; $3.4bn IREN contract
Wants its silicon deployed fast and its installed base defended. Its equity and offtake commitments lower the cost of capital of the buyers of its own product — which raises demand for the product and improves the collateral value that lenders underwrite. The interest is real and it is not the shareholders' interest.
Anchor customersMicrosoft · Meta · OpenAI
Why they rentSpeed, not cost
Their alternativeBuild, or don't buy
Disclosed exitNebius 6-K: terminate on missed delivery
Every one of them is building its own capacity at the same time it is renting. The contract is a hedge against their own construction schedule slipping. When it stops slipping, the renewal conversation changes.
LendersBlackstone · Blue Owl · PIMCO · MUFG
What they underwriteThe contract, not the operator
Best rating achievedA3 / A(low), ring-fenced SPV
Spread for non-IG9.0% fixed vs 6.0%
They price the counterparty's credit and the residual value of the silicon, and ring-fence both away from the operating company. That is rational for them and it means the investment-grade label attaches to Meta's or Microsoft's promise, not to the neocloud.
Equity holdersThe residual
CoreWeave+54% weighted shares y/y
IREN~4× shares since FY2024
Nebius$2.8bn ATM + $2bn warrants
Growth has been paid for by dilution at all three, and additionally by leverage at one. Those are different bills arriving on different dates: dilution is charged immediately and permanently, interest is charged quarterly and compounds against a fixed asset life.
Method: NVIDIA's Nebius position is understated by the 13F, which captures common shares only; a $2bn prefunded warrant issued in March 2026 is not reportable until exercisable. IREN's NVIDIA share right is conditional on delivery of up to 600,000 GPUs and regulatory conditions and has not vested.
Synthesis: NVIDIA occupies three seats at the table at once. Each of its roles is individually defensible; together they mean the sector's cost of capital, its demand floor and its collateral values all depend partly on decisions made by its supplier.

Street prices are the discipline on all of this, and what they show is dispersion rather than a single price. A street-price index dated 10 July 202654 puts H100 on-demand rental at a median of $4.29 per GPU-hour across seven providers, against $1.33 at the cheapest marketplace and $6.88 to $12.29 at the hyperscalers; B200 runs $2.71 at the cheapest marketplace, $3.50–$7.15 at specialist clouds and $14.00–$27.04 at hyperscalers. CoreWeave's own GB200 NVL72 pricing appears in the same index at $10.50 per GPU-hour for inference and $42.00 on-demand. Two things follow. Prior-generation hardware has not become worthless — a two-year-old H100 still clears above a dollar an hour, and CoreWeave says it is sold out of prior generations. And the spread between marketplace and hyperscaler pricing for the identical chip is roughly ten to one, which means the price of compute is mostly the price of everything around the chip.

The private peers show how contestable this is. Lambda reached $505 million of annualised revenue by May 2025 at a 61% gross margin and hired Morgan Stanley, J.P. Morgan and Citi to prepare a US listing55; Crusoe has raised billions on the same story. Neither owns anything the listed three do not, and both buy the same GPUs. The barrier to entering this business is capital and power, in that order — and capital has been abundant.

Part II — The comparison and the ranking

Part II states the criteria and their weights, argues the three against each other, tests the moat claims as far as the disclosure allows, sizes a downcycle, and ranks the three with a falsifier and a confidence grade for each name.

09The criteria, and why they are weighted this way

The criteria come before the answers. Five of them carry weights, and the reasoning for each weight sits on the page where a reader can disagree with it.

Figure 17The five criteria and their weights
CriterionWeightWhat it measuresWhy this weight
Funding-model resilience30%Cost of capital, maturity profile, dependence on markets that close in a downturn, cash against committed spendThe heaviest weight because it is the only criterion that determines survival rather than performance. A business with the best contracts and the wrong capital structure does not get to use the contracts.
Durability of contracted economics25%Size, tenor, counterparty quality, prepayment, termination terms, and how much of the book is attached to delivered capacitySecond-heaviest because contracted cash flow is the asset. Discounted for the fact that every anchor is also a potential self-builder.
Unit economics and cost position20%Gross margin before depreciation, power cost per unit of revenue, revenue per MW, capex intensityCost position is what survives a price war. Weighted below the first two because the current price environment has not yet tested it.
Moat mechanism15%What specifically a competitor would have to replicate, how long it would take, and whether money alone sufficesDeliberately modest. In a sector two years old, most claimed moats are conditions. A low weight prevents a narrative from carrying the ranking.
Optionality10%Assets and business lines that could matter and sit outside the base caseLowest weight: real, but by definition unproven. Included because two of the three carry material optionality that a pure-compute frame would miss.
Evidence: Criteria constructed for this study; the underlying measures are drawn from the disclosures cited throughout Part I.
Method: Weights are a stated judgment, not a derived quantity. The scorecard in Figure 23 is presented so a reader applying different weights can reach a different order from the same evidence — the head-to-head findings below stand independently of the weighting.
Synthesis: Weighting funding at 30% is the single decision that most affects the outcome. It is defended on the observation that this sector's assets are financeable and its equity is not yet self-funding, so the binding constraint is access to capital rather than access to demand.

10Head to head

Funding-model resilience — IREN, then Nebius, then CoreWeave

How much each company still needs from outside decides the ranking inside that rate gap. IREN's recourse debt is $6.75 billion of convertible notes at a 0.88% weighted coupon with maturities from 2029 to 2033; its cash interest bill last year was $46.6 million; its GPU financings are non-recourse and 90–96% funded by a combination of facility and prepayment. It could stop building tomorrow and service everything from the mining business alone. Nebius holds $8.0 billion of cash against $155 million of annual coupon and has demonstrated repeated access to the convertible market — but its $20–25 billion capex plan has no committed loan book behind it, and its equity-linked funding is priced off a share price that has ranged from $63.26 to $299.86 over the past year. CoreWeave's $3.6 billion of annual interest is contractual, senior, and does not shrink if a customer defers.

CoreWeave's answer to the leverage charge is stronger than the headline number suggests. Its debt is matched to contracts: the DDTL structures amortise against specific customer cash flows, and management describes each deployment as "fully repaying asset level debt used to fund the CapEx" so that "when an initial contract ends, the cluster no longer has any leverage." If that is true across the book, then the leverage is not a permanent claim on the enterprise but a self-liquidating claim on individual contracts — which is a fundamentally different risk. The evidence for it is the A3 rating on the DDTL 4.0 vehicle and the fact that CoreWeave has refinanced at successively lower rates for a year. The evidence against it is that gross debt rose from $20.7 billion to $31.4 billion of recourse debt in six months while the amortisation was supposedly happening. Both can be true in a company growing this fast. The resolution is arithmetic: the structure is self-liquidating only if new builds stop, and stopping is the one thing a company with $35.5 billion of uncommenced leases cannot easily do.

Contracted economics — CoreWeave, then Nebius, then IREN

On this criterion the order reverses cleanly. CoreWeave has $104 billion of backlog with more than half attached to capacity where delivery has commenced, a customer set that has broadened from one name at 67% to three names at 72%, a Meta contract running to December 2032, and a $6.3 billion NVIDIA obligation to buy residual unsold capacity through April 2032 — a floor no competitor has. Nebius has $37.5 billion of RPO plus more than $40 billion of stated customer commitments, two hyperscale anchors and 41% of revenue outside the top three. IREN has roughly $16.5 billion across two accounting regimes, one dominant customer, and — on the disclosed per-megawatt figures — the worst price in the group on its largest contract.

Figure 18The contracted book, put on one measure
CoreWeave$104.0bnNebius$37.5bnIREN$16.5bn
Evidence: CoreWeave revenue backlog ~$104bn (Q2 2026 release1), of which $103,700m is RPO (10-Q revenue note9); Nebius RPO $37,490.6m (interim statements14); IREN $5,100m RPO plus ~$11,400m of ASC 842 lease contract value (FY2026 revenue note13).
Method: IREN's $16.5bn is this report's construction — the two disclosed measures added, because they are separately reported and neither alone represents the contracted book. The three figures still differ in composition: CoreWeave's includes company-defined "other estimated future revenue"; none is adjusted for tenor, so a dollar of 2032 revenue counts the same as a dollar of 2027 revenue. Red marks CoreWeave, whose book is 1.9× the other two combined.
Synthesis: The rank order survives normalisation, but the gap narrows sharply for IREN once its lease-classified contracts are counted — from a 20-to-1 apparent ratio on RPO alone to about 6-to-1.

Size is the easy half. The harder question is when the book turns into revenue, and all three disclose enough to answer it.

Figure 19Backlog conversion — when the book becomes revenue
WindowCoreWeave (RPO $103.7bn)Nebius (RPO $37.5bn)IREN (RPO $5.1bn)
Next 12 monthsnot split outnot split out$0.9bn (18%)
Months 13–24not split outnot split out$1.3bn (25%)
First 24 months41% ≈ $42.5bn (from 1 Jul 2026)36% ≈ $13.5bn (to 30 Jun 2028)$2.2bn (43%)
Months 25–4839% ≈ $40.4bn (48 months from 1 Jul 2028)40% ≈ $15.0bn$2.9bn (57%) across months 25–60
Thereafter~20% ≈ $20.8bn~24% ≈ $9.0bn
Attached to commenced deliveries>50%, guided to >2/3 by end-2026not disclosednot disclosed
Contracted value outside RPO~$0.5bn of "other estimated future revenue"; >$25bn signed in early Q3 and excluded>$40bn of stated customer commitments against $37.5bn of RPO~$11.4bn of ASC 842 lease value, no schedule disclosed
Method: Dollar figures are the disclosed percentages applied to each disclosed RPO; the "thereafter" rows are residuals (100 − 41 − 39 = 20% for CoreWeave; 100 − 36 − 40 = 24% for Nebius). The windows are not identical — CoreWeave's second tranche is described as the 48 months beginning 1 July 2028 rather than months 25–48 from today — so the rows align in intent, not in precise dating. IREN's lease-classified contracts carry no disclosed conversion schedule and cannot be placed on this timeline at all.
Synthesis: All three books convert on a similar clock: roughly 40% inside two years, roughly 40% in the following four, the balance beyond. That means a fifth of CoreWeave's book — about $21bn — depends on demand conditions in the 2030s, and it means none of the three has a book that would carry it through a long price trough on its own.

CoreWeave's book is the longest-dated, which is protection and exposure at once: 39% of its RPO converts in the four years beginning July 2028, so a material fraction of the value depends on demand conditions in 2030 and beyond. Nebius's Microsoft contract carries a disclosed customer termination right on missed delivery, and its Meta capacity does not come online until early 2027. IREN's book is smallest but has the highest disclosed prepayment intensity — 45–55% of GPU capex arriving as cash before the service is delivered, plus 20% of the Microsoft contract paid up front — which is the most protective contract feature available in this market and the one least visible in a backlog table.

Unit economics and cost position — IREN, then Nebius, then CoreWeave

IREN's AI Cloud segment ran at 86.9% gross margin before depreciation with electricity at 3.5% of segment revenue. Nebius's group figure on the same basis was 77.1% in the June quarter with an AI-cloud adjusted EBITDA margin of 49.7%. CoreWeave reported 59% adjusted EBITDA and a 5% adjusted operating margin, on a cost-of-revenue definition that includes depreciation of power infrastructure and is therefore not directly comparable at the gross line.

Capex intensity sharpens the same ordering differently. CoreWeave is spending 2.9 times its guided 2026 revenue; Nebius roughly 7 times. IREN gives no calendar capex guidance. Its $13.8 billion of commitments against a >$4 billion exit-ARR target implies a similar multiple to CoreWeave's. High capex intensity is what a land-grab looks like. It also means every one of these companies is valued on capacity it has not yet built, and Nebius most of all.

Moat mechanism and optionality

Both are argued in full in the next section. In summary: IREN holds the only asset in the group whose replacement cost has risen materially since it was acquired; Nebius holds the only software layer with independent evidence of quality and the only equity stakes worth a material fraction of its market value; CoreWeave holds the only scale advantage, which is real, and the only supplier-backstopped revenue floor, which is a contract rather than a moat.

11The moat question

The strongest case against everything in this report goes roughly as follows, and it is not a straw man.

There is no moat here and there was never going to be one. Three companies buy identical hardware from a monopoly supplier at prices that supplier sets. They sell it to four or five buyers who could build the same capacity themselves and are visibly doing so. The contracts that look like moats are hedges the buyers take against their own construction schedules, priced by the buyers, terminable by the buyers if delivery slips. The financing that looks sophisticated is a mechanism for transferring the buyers' credit quality to the seller's balance sheet, which means the value being financed belongs to Microsoft and Meta rather than to CoreWeave or IREN. Power is a genuine constraint but it is a constraint on everyone equally, and permitting queues clear; the same argument was made about fibre in 1999 and about data-centre land in 2007. On this reading the correct number of neoclouds in 2032 is one or two, they will be owned by their largest customers or by an incumbent with a real balance sheet, and today's contracted backlogs are the high-water mark of a period when compute was scarce.

That case has real evidence behind it. Microsoft did decline a $12 billion expansion. Oracle booked $638 billion of RPO in a single fiscal year without owning a single differentiated thing about GPU rental. On-demand H100 prices have fallen through the asset's life exactly as a commoditising input should. Lambda and Crusoe can raise billions on the same story. And the most-quoted proof of the sector's maturity — the A3-rated GPU financing — is a rating on a ring-fenced vehicle holding one customer's contract.

Where the case breaks down is on the word "equally." Power is a constraint on everyone, but not at the same price, and the difference is not small.

What each company would actually make a competitor replicate

CoreWeave: scale, and the financing structures scale unlocked. A competitor would have to reach 1.5 GW of energised capacity, more than a dozen live financing instruments, an investment-grade-rated GPU securitisationPackaging a stream of contracted payments, and the assets that produce them, into a separate vehicle and selling bonds backed by that stream. It is how mortgages, car loans and aircraft leases have long been financed. Applying it to GPUs is new, and it works only for as long as lenders trust their estimate of what the hardware will be worth at the end., and a relationship with NVIDIA that produced both a $4.7 billion equity position and a $6.3 billion residual-capacity backstop. Time to replicate: three to four years and roughly $35 billion, assuming the capital markets stay open. That is a formidable barrier and it is a barrier of capital, not of right. It compounds while the sector is short of capacity and erodes the moment it is not. On the strict test — could a competitor buy this at today's prices — the answer is yes, expensively. Crusoe is trying.

Nebius: the software layer, and the multi-tenant architecture underneath it. A competitor would have to build an orchestration and inference platform that hundreds of small customers choose over a hyperscaler's. There is independent evidence this exists: Nebius reports full accuracy parity on GLM-5.2 in Artificial Analysis's Endpoint Accuracy Index while ranking among the fastest providers, and inference workloads on its Token Factory more than tripled in a quarter. Time to replicate: two to three years of engineering, which is cheap relative to $20 billion of capex. The harder question is whether the layer can hold margin against AWS, Azure and Google, who have the same software and better distribution. Nebius's own answer — that it serves "the full workload lifecycle on one platform" where standalone inference providers do not — is a product argument, not yet a pricing-power argument. The 41% of revenue outside its top three customers is the best available evidence that it is winning small customers on something other than price, and it is indirect.

IREN: grid positions bought when nobody wanted them. This is the one that survives the test. IREN's Childress, Mackenzie, Prince George and Canal Flats sites were acquired to mine bitcoin, in an era when a data-centre developer would not have bid for them. The company now runs AI capacity at those sites where electricity is 3.5% of revenue. A competitor starting today cannot buy 2022 grid positions at 2022 prices; it can only join an interconnection queue, and queue position is the one input in this business that money does not accelerate. The queue is a physical fact rather than a figure of speech. Anyone wanting to draw large power from a grid applies to the utility, which studies whether the local network can carry the load and generally has to reinforce it before the connection can be granted. Those studies and that construction run on their own clock, and applications are worked in the order they arrive. A buyer can pay more for the land. There is no price at which the utility moves the project up the line. That is a genuine, mechanism-level advantage, and it is the only one in the group.

Three qualifications belong with it. IREN does not own generation — it buys power under regulated tariffs in British Columbia and Oklahoma and at ERCOT market prices in Texas, so the advantage is a position in a queue and a low-cost region rather than a physical hedge. The advantage is a spread, and it narrows if wholesale power prices fall or if AI compute prices fall faster than power prices. And it applies to a portfolio that is still overwhelmingly unbuilt: 5 GW secured against roughly 40 MW of AI capacity operating. An advantage in an asset you have not yet developed is an option, not an annuity.

Figure 20The bottleneck test, applied
Claimed advantageWho controls itReplicable?What removes it
CoreWeave: scale and financing accessCapital markets and NVIDIA jointlyYes — ~$35bn and 3–4 yearsA closed credit market, or a competitor with a cheaper balance sheet doing the same thing
CoreWeave: NVIDIA residual-capacity backstopNVIDIA, terminable on 30 days' notice of breachNo, but it is a contract, not a barrierNVIDIA offering it to others, or the order form expiring in April 2032
IREN: cheap grid positionsIREN, by ownership of land and connection agreementsNot at today's pricesWholesale power prices falling, or the AI-vs-mining revenue spread compressing from ~13× toward 1×
IREN: self-build capabilityIREN's own engineering organisationYes — developers do this for a feeThird-party shell supply becoming abundant, which removes the cost gap but not the schedule control
Nebius: full-stack softwareNebius, and partly the open-source projects it builds onYes — 2–3 years of engineeringHyperscaler platforms matching it, which they can; or customers standardising on open tooling
Nebius: equity stakes and asset-light modelNebius, contingent on partners' capitalHard to copy stake for stake; it is a portfolio, not a compute moatNothing to remove; the stakes are optionality, correctly valued as such
All three: customer switching costsNobody, materiallyn/aAlready absent — Nebius's top customers rotated entirely in one year
Evidence: As cited throughout sections 03–08, principally the three issuers' latest annual and interim filings, the NVIDIA order-form 8-K27, IREN's cost of revenue note31 and Nebius's customer concentration disclosure14.
Method: "Replicable?" asks whether a well-capitalised competitor could acquire an equivalent position with money and time available today. Replication estimates are this report's judgment, anchored on disclosed capex and build timelines, and are inferences rather than facts.
Synthesis: One row in this table answers "not at today's prices." Every other claimed advantage is a lead, a contract, or an option — all valuable, none of them a moat in the strict sense.

The debates, argued on their merits

Are take-or-pay contracts from self-building customers durable demand or a bridge? The evidence says bridge, with a long deck. Every anchor is expanding its own capacity; Microsoft has already declined one expansion; the Nebius disclosure shows the customer holds the termination right on delivery failure, not the reverse. But a bridge with a 2032 end date and a prepayment attached is a very good asset, and the renewal question is genuinely open rather than settled. What would resolve it: a single disclosed renewal, at term, at a stated price, by any of the three. None exists yet. That absence is the largest unanswered question in the sector and it will start answering itself around 2028.

Is owned power a moat or only a cost advantage that matters at commodity prices? Both, and the distinction is about when. At today's prices, where IREN sells a megawatt-year for above $20 million and pays 3.5% of that for electricity, power cost is nearly irrelevant to margin. If contract prices halved, power cost would become the difference between a viable and an unviable megawatt. Owned cheap power is therefore insurance that pays out precisely in the scenario that threatens the sector — which is the definition of a valuable but currently invisible asset.

Can a software layer hold margin above rented hardware? Nobody has shown it yet at scale. Nebius's 49.7% AI-cloud EBITDA margin is real but is earned on scarce hardware in a supply-constrained market, and CoreWeave earns 59% with a different software story. The test comes when capacity is abundant and the two companies' prices diverge or do not. Nebius's own strongest evidence is not its margin but its customer mix: 41% of revenue from outside its three largest accounts, in a business where CoreWeave's equivalent is 28%.

Is GPU-backed leverage intelligent structuring or the sector's fault line? It is intelligent structuring of an asset whose residual value nobody has yet observed. The A3 rating is real; so is the fact that it depends on collateral valuations for hardware that has never been sold second-hand at scale after a full contract term. The private-credit question is not whether the first-lien lender gets paid — the contract cash flow covers it — but what happens to the market's appetite the first time an SPV has to remarket a fleet mid-life. That has not happened.

Alternatives considered and rejected

Three framings were tested and set aside. Ranking by backlog was rejected because the three books are measured under different accounting regimes and the scope error is larger than the differences it would purport to show. Ranking by reported operating margin was rejected because the depreciation policies differ by up to two years of useful life, worth roughly $950 million a year of pre-tax income to CoreWeave alone. Ranking by revenue per megawatt was rejected as a primary measure because CoreWeave does not disclose it, because rack density differs by generation and cooling type — IREN's own air-cooled NVIDIA contract prices at $11.3 million per MW against liquid-cooled deals above $20 million — and because contract vintage dominates the variation. Each of these reopens if the underlying disclosure changes: a common useful life across the three, or per-megawatt pricing from CoreWeave, would make the second and third framings usable.

Second- and third-order effects

A GPU glut does not hit these three equally, and the transmission mechanism is not the one people expect. The channel is not utilisation — all three are substantially contracted for two years — it is the renewal price against a fixed capital cost. CoreWeave's fixed cost is $3.6 billion of cash interest plus lease payments on sixteen-year buildings; a re-contracting at 70% of current pricing leaves it covering interest and little else. IREN's fixed cost is $126 million of interest today and roughly $534 million once its GPU facilities fully draw; the same 30% price cut leaves it comfortably covered. Nebius sits closer to IREN. The order in which these machines break under price pressure is the reverse of the order of their contracted books.

An NVIDIA architecture shift produces a subtler asymmetry. Fleets age on different clocks: CoreWeave's is the oldest and largest, IREN's is almost entirely 2026 vintage, Nebius's is in between and it has already taken delivery of Vera Rubin NVL72 systems for validation. A generational reset therefore lands hardest on the company with the most depreciated-but-not-written-down silicon — and that company also has the longest assumed useful life. Those two exposures compound rather than offset. The third-order effect is on the lenders: an architecture shift that impairs residual values would reprice GPU-backed credit for everyone, including the two companies that barely use it, because the sector's marginal financing cost is set by the marginal lender's view of collateral.

If Nebius's asset-light model works, the most capital-efficient way to be a neocloud stops being to own the fleet. That would devalue exactly the thing CoreWeave has spent $35 billion assembling and would leave IREN's position — owning the scarce input rather than the depreciating one — looking the most durable of the three. It is early, it is unquantified, and it is the scenario least priced into any of the three narratives.

12The downcycle test — who breaks first

The useful stress on this sector is a price shock at re-contracting, against a capital structure that does not reprice. A demand collapse is the wrong test: all three are contracted two years deep, and a demand shock takes that long to reach them. So the test below holds each company's disclosed adjusted-EBITDA margin constant, cuts revenue to 75% and then 50% of its current run rate, and measures the result against contractual cash interest. What that produces is an interest-coverage ratio: earnings divided by the interest owed on the debt. Cover of two times means a business earns twice what it must hand to its lenders. Below one it is not earning its interest bill at all and has to find the shortfall somewhere else — cash reserves, fresh borrowing, or new shares — which is the point at which a bad year stops being a profit problem.

Figure 21Cash-interest coverage under a re-contracting price shock
CoreWeaveIREN (pro-forma)Nebius
Revenue run-rate used$10,300m$4,000m$2,329m
Adj. EBITDA margin applied59% (disclosed)55% (assumed)41% (disclosed)
Annual cash interest$3,600m$534m$155m
Interest / revenue at base35.0%13.4%6.6%
Coverage at 100% of run-rate1.69×4.12×6.17×
Coverage at 75%1.27×3.09×4.63×
Coverage at 50%0.84×2.06×3.08×
Interest / revenue at 50%69.9%26.7%13.3%
Evidence: CoreWeave Q2 2026 revenue $2,575m and 59% adjusted EBITDA margin, Q3 interest guidance $860–940m (Q2 2026 call10). Nebius Q2 2026 revenue $582.3m and 41% group adjusted EBITDA margin (Q2 release3); interest from Figure 12. IREN 2026 contracted ARR >$4bn (FY26 release5); interest pro-forma for the $3.6bn Microsoft facility and $2.4bn Blue Owl facility fully drawn.
Method: Revenue run-rate = latest quarter × 4 for CoreWeave and Nebius; for IREN the disclosed 2026 contracted ARR is used because its latest quarter is majority bitcoin mining and unrepresentative of the forward business. IREN's 55% margin is an assumption — it is below its 86.9% AI Cloud gross margin before depreciation and allows for a full corporate cost base; no group AI-cloud EBITDA margin is disclosed. CoreWeave interest = $900m guidance midpoint × 4 and excludes operating lease payments on $16.3bn of lease liabilities, so its coverage is flattered. Holding margins constant through a price cut is generous to all three, since costs are substantially fixed.
Synthesis: A 50% re-contracting price cut leaves CoreWeave unable to cover cash interest from EBITDA before any lease payment or maintenance capex, while both peers retain two-to-three times cover. The order of fragility is the inverse of the order of contracted backlog.

Two caveats keep this from being a verdict. The first is timing: CoreWeave's book converts over years, so a price shock reaches it gradually, and the company has already demonstrated it can refinance downward — 300 basis points in a year, worth $1.1 billion annualised. Repeat that twice more and the base-case coverage improves materially without any change in revenue. The second is that the scenario tested is severe. A 50% cut in re-contracting prices has not happened in this market; the observed move in the last twelve months has been upward, with CoreWeave raising list prices about 25% in July 2026 and Nebius reporting more than 30% higher pricing on older-generation GPUs than in the prior quarter.

The table does not establish that CoreWeave will break. It establishes that CoreWeave is the only one of the three for which a price shock is a solvency question rather than a profitability one, and that the difference comes from the funding decision, not from the quality of the business.

13The ranking

Figure 22The scorecard, by criterion
IRENNebiusCoreWeaveFunding resilience (30%)StrongestStrongWeakestContract quality (25%)Thin, concentratedStrongStrongestUnit econ / cost (20%)StrongestStrongMiddlingMoat mechanism (15%)Land + powerSoftware onlyScale onlyOptionality (10%)ModerateHighestModerate
Evidence: The head-to-head findings in section 10 and the moat test in Figure 20, each resting on the filings cited there.
Method: Ratings are ordinal within each row and are not comparable across rows. Ink = strongest of the three on that criterion, mid-grey = middle, light grey = weakest but not adverse, red = a weakness material enough to threaten the business. Every rating is also stated in words so the figure is legible without colour.
Synthesis: No company wins on more than three criteria and each wins at least one. The order depends entirely on the weights, which is why they are stated in Figure 17 and tested below.
Figure 23The weighted score, and how sensitive it is
Criterion (weight)IRENNebiusCoreWeave
Funding resilience (30%)5.03.52.0
Contracted economics (25%)2.04.05.0
Unit economics / cost (20%)5.04.03.0
Moat mechanism (15%)4.03.02.0
Optionality (10%)3.05.03.0
Weighted total3.903.803.05
Rank123
Alternative weights: contract 40%, funding 20%3.503.903.50
Evidence: Scores assigned from the head-to-head evidence in section 10; weights from Figure 17.
Method: 1–5 ordinal scores, weighted and summed. Nebius scores 3.5 rather than 4.0 on funding because its two working channels — an at-the-market equity programme and convertible issuance — are both priced off its own share price, which is the variable a downcycle removes. The alternative-weights row re-runs the same scores with contracted economics at 40% and funding at 20%: Nebius moves to first and IREN and CoreWeave tie.
Synthesis: The 0.10 gap between IREN and Nebius is inside the resolution of this evidence and should be read as a tie at the top. The 0.75 gap to CoreWeave is not, and it survives every weighting tested that does not put contracted economics above 40%.

The ranking, stated plainly: IREN first, Nebius a very close second, CoreWeave third. IREN and Nebius should be read as jointly ranked; the evidence does not separate them and the tiebreak is a judgment about what kind of advantage survives a bad year. IREN's cheap grid positions do not depend on anyone's willingness to buy its shares. Nebius's funding menu does. That is the whole of the difference between first and second, and a reader who thinks equity-market access is more durable than an interconnection queue should swap them.

CoreWeave's third place needs defending, because on the criterion most people use — contracted revenue — it wins outright, and this report has argued that contracted cash flow is the asset. The defence is that the ranking grades durability, and CoreWeave's contract book is financed in a way that converts a bad year into a solvency problem rather than a bad year. It has the largest book, the most delivered capacity, the strongest supplier relationship and the only investment-grade GPU financing in existence. It also pays 9.00% on $35.6 billion, carries $16.3 billion of lease liabilities with another $35.5 billion queued, and covers cash interest 1.69 times at its current run rate before any lease payment. Rank it first on scale and execution; the evidence does not support ranking it first on durability.

IRENIRENRank 1 — structurally strongest
1.64%Wtd-avg debt cost
3.5%Power / AI revenue
ModerateConfidence
Contracted or disclosed today: ~$16.5bn of contracted value across ASC 606 and ASC 842; Microsoft $9.7bn with 20% prepaid; NVIDIA $3.4bn; ~5GW of secured power; 86.9% AI Cloud gross margin before depreciation; $7.6bn of cash and restricted cash. Hoped, not contracted: that 5GW of grid agreements becomes energised capacity on schedule, that new contracts hold above $20m per MW, and that the $13.6bn of twelve-month commitments is met by financings and prepayments that have not all drawn. Falsifier: if Horizons 2–4 are not delivered to Microsoft by 31 March 2027, or 2027 deliveries fall below 0.6GW of IT load, the cost advantage is attached to an organisation that cannot build and the rank fails.
Nebius GroupNBISRank 2 — statistically tied with IREN
$37.5bnRPO
49.7%AI cloud adj. EBITDA margin
ModerateConfidence
Contracted or disclosed today: $37.5bn RPO and >$40bn of stated commitments; Microsoft to ~$17.4bn and Meta to ~$27bn; $8.0bn cash; ARR of $3.0bn at June 2026; 41% of revenue outside the top three customers. Hoped, not contracted: the 5GW year-end contracted-power target, the asset-light partner model, and $20–25bn of 2026 capex funded largely by prepayments and equity-linked paper with no committed loan book. Falsifier: if the share price falls far enough to close the ATM and convertible windows for two consecutive quarters while capex guidance is maintained, the funding model is a condition rather than a structure and the rank fails.
CoreWeaveCRWVRank 3 — strongest book, thinnest margin for error
9.00%Wtd-avg debt cost
1.69×Cash interest cover
ModerateConfidence
Contracted or disclosed today: $104bn backlog with >50% attached to commenced deliveries; 1.5GW active and 4.2GW contracted power; $6.3bn NVIDIA residual-capacity obligation to 2032; a ~25% July price increase; an A3-rated $8.5bn facility. Hoped, not contracted: that $35–39bn of 2026 capex is financed at falling rates, that 39% of RPO converting after mid-2028 renews at economic prices, and that $35.5bn of uncommenced leases are delivered and filled. Falsifier: if cash interest cover falls below 1.5× on a trailing four-quarter basis, or a top-three customer is disclosed as not renewing at term, the leverage stops being financing and becomes the business's defining constraint.

Verdicts are structural assessments of business durability. They are not investment recommendations and carry no view on any security's price. Confidence is sized to the disclosure available: all three are rated Moderate because none of the three has yet been observed through a full contract renewal cycle.

14Predictions, falsifiers and what to watch

Nine claims below are dated and checkable. Each can be scored against a disclosure that will exist by the stated date, and each is wrong if the stated observable does not occur.

Figure 24Dated predictions, and what settles them
#PredictionBySettled by
1CoreWeave's weighted-average interest rate falls below 8.0% while gross debt principal exceeds $45bn — refinancing continues but does not shrink the balanceQ4 202710-Q/10-K debt narrative
2CoreWeave reports at least two consecutive quarters of positive GAAP operating income at its six-year scheduleQ4 2027Statement of operations
3At least one of the three changes a GPU or server useful life again; the change increases reported incomeDec 2028Accounting-policy note
4IREN discloses AI Cloud Services revenue above $2.0bn for a fiscal yearFY2028 (Jun 2028)10-K segment disclosure
5IREN's operating AI capacity reaches at least 600MW of IT loadDec 202710-K/10-Q Item 1 and results releases
6Nebius discloses revenue from the asset-light partnership model as a separate or named lineDec 2027Shareholder letter or 20-F
7Nebius issues a secured facility of at least $3bn — the $775m July 2026 deal was a template, not an exceptionDec 20276-K
8A first major contract renewal at term is disclosed by any of the three, at a stated price, and the renewal price is at or above the original per-MW rateDec 20298-K/6-K or earnings call
9At least one GPU-backed SPV in the sector remarkets a fleet mid-life, and the recovery is disclosedDec 2030Rating-agency action or issuer disclosure
Evidence: Each prediction is anchored on a trajectory established in Part I — CoreWeave's ~300bp of annual rate reduction and $35–39bn capex plan; IREN's 0.3GW 2026 and 0.8GW 2027 IT-load targets and >$4bn contracted ARR; Nebius's $775m July 2026 facility and asset-light launch.
Method: These are inferences from disclosed plans, not forecasts derived from a model. Predictions 8 and 9 are the two that would most change the analysis and are the furthest out, which is a limitation of the sector's age rather than of the method.
Synthesis: Predictions 1 and 2 test whether CoreWeave's leverage is self-liquidating. Predictions 4 and 5 test whether IREN can build. Predictions 6 and 7 test whether Nebius's funding model generalises beyond its share price. Prediction 8 is the one that decides the sector.
Q4 2026IREN Horizons 2–4 targeted for delivery to Microsoft at Childress — the first test of whether the 5GW portfolio is buildable on schedule
Q4 2026CoreWeave year-end target of >1.85GW active power and $18.5–19.5bn exit ARR
Q4 2026Nebius year-end target of 5GW contracted power and $7–9bn ARR against $3.0–3.4bn of 2026 revenue
Early 2027Nebius capacity for the second Meta agreement due online — the delivery condition that governs the contract
2027Nebius plans to deploy >1GW per year; IREN targets 0.8GW of IT load; CoreWeave targets >3GW of active power
Apr 2032CoreWeave's NVIDIA residual-capacity order form expires; Meta's dedicated-capacity agreement runs to Dec 2032

Dates as disclosed in each issuer's most recent results materials: IREN FY26 release5, CoreWeave Q2 2026 call10, Nebius Q2 2026 shareholder letter4, CoreWeave–Meta release28.

The central claim: the funding model, not the business model, separates these three — and it decides who survives the first genuine downcycle.
  • CoreWeave reaching sustained positive GAAP operating income while gross debt stops rising would show that 9% money against a six-year asset can work, and would collapse the spread this whole argument rests on.
  • A neocloud failing on execution rather than on financing — a company with a clean balance sheet missing deliveries badly enough to lose an anchor — would show that delivery risk dominates capital structure.
  • Re-contracting at or above original prices, disclosed by any of the three, would make the depreciation and renewal debates moot and would favour the largest fleet, which is CoreWeave's.
  • IREN's power advantage proving illusory — new contracts at its sites priced no better than at leased colocation — would remove the only mechanism-level moat identified here.

Every argument in this report treats the three as competitors, and on any given contract they are. But the constraint they share is more important than the differences that separate them: none of the three sets the price of its input, none controls the architecture cadence that resets its fleet, and none has a customer whose alternative is worse than building. What they are competing for is the right to carry other people's capital risk in exchange for a spread. The best business in that trade is the one with the cheapest capital and the scarcest input. On today's evidence that is IREN, narrowly, and the case is not yet proven.

§Evidence register

Every source below was opened and read in the preparation of this brief. Tier 1 = issuer filings and regulator submissions. Tier 2 = issuer-hosted transcripts, shareholder letters and press releases. Tier 3 = single-source, aggregated or estimated material, used only where flagged in the text. Dates are filing or publication dates; event dates are stated separately in the prose where they differ.

#SourceDateTierWhat it carries here
171 CoreWeave 8-K exhibit — Q2 2026 earnings release11 Aug 20261$104bn backlog; 1.5 GW active; 3.7 GW contracted; adj. EBITDA
252 IREN 10-K FY2026 — statement of operations27 Aug 20261FY26 revenue $707.0m; impairment $638.8m; net loss $702.6m
363 Nebius 6-K exhibit — Q2 2026 results release12 Aug 20261Revenue $582.3m; cash $8,042.1m; capex $8,130.3m H1; debt $8,499.0m non-current
514 Nebius Q2 2026 letter to shareholders12 Aug 20262ARR $3.0bn; 5 GW target; $20m+/MW pricing; prepayments; asset-light model; five-year life
315 IREN 8-K exhibit — FY26 results release27 Aug 20261Segment revenue; $4bn contracted ARR; per-MW pricing; GPU financings
116 CoreWeave 10-Q Q2 2026 — subsequent events12 Aug 20261DDTL 5.5 facility, $2.6bn, and drawdowns
17 CoreWeave 10-Q Q2 2026 — balance sheet12 Aug 20261Cash, PP&E, leases, debt, equity at 30 Jun 2026
88 CoreWeave 10-Q Q2 2026 — debt schedule12 Aug 20261$35,551m gross debt; facility-by-facility rates
49 CoreWeave 10-Q Q2 2026 — revenue narrative12 Aug 20261RPO $103,700m and its conversion schedule
5010 CoreWeave Q2 2026 earnings call transcript11 Aug 20262Guidance; 4.2 GW contracted; 8 GW by 2030; ~25% July price increase; ~300bp debt cost reduction
2411 IREN 10-K FY2026 — balance sheet27 Aug 20261Cash $5,895.6m; restricted $1,723.9m; debt; equity
2912 IREN 10-K FY2026 — debt note27 Aug 20261Six convertible series; DDTL and USPP terms; $46.6m interest expense
2613 IREN 10-K FY2026 — revenue note27 Aug 20261$5.1bn RPO; ~$11.4bn ASC 842 lease contract value; classification logic
3714 Nebius 6-K exhibit — interim financial statements12 Aug 20261RPO $37,490.6m; customer concentration; 4→5 year life change and its effect
5515 stockanalysis.com — CRWV, IREN, NBIS3 Sep 20263Market capitalisation and share counts at 13:00 EDT
216 CoreWeave 10-Q Q2 2026 — statement of operations12 Aug 20261Revenue, opex, interest, net loss, EPS
717 CoreWeave 10-Q Q2 2026 — leases narrative12 Aug 20261~$35.5bn of leases not yet commenced; 355 MW power prepayment
2318 IREN Form 10-K FY2026 — Item 1 Business27 Aug 20261~5 GW secured; site list and MW; ~40 MW AI capacity operating
2819 IREN 10-K FY2026 — PP&E note27 Aug 20261GPU hardware $2.03bn; five-year straight-line life; impairments
921 CoreWeave 10-Q Q2 2026 — debt narrative12 Aug 202619.00% weighted-average interest rate
1523 CoreWeave 10-K FY2025 — customer concentration2 Mar 2026167% / 62% / 35% top-customer share, FY2023–25
524 CoreWeave 10-Q Q2 2026 — customer concentration12 Aug 2026136% / 26% / 10% concentration, Q2 2026
2225 CoreWeave Form S-13 Mar 20251Named customers; no revenue percentage attached to any name
5426 CoreWeave — OpenAI expansion release25 Sep 20252Up to $6.5bn; cumulative ~$22.4bn across three agreements
1827 CoreWeave 8-K — NVIDIA order form15 Sep 20251$6.3bn residual-capacity obligation to 13 Apr 2032; termination terms
2028 CoreWeave 8-K exhibit — Meta agreement9 Apr 20261~$21bn through December 2032
5229 CoreWeave IR — Q2 2026 results release11 Aug 20262Backlog composition; >$25bn of Q3 commitments; named enterprise wins
2130 CoreWeave 8-K exhibit — DDTL 4.0 facility31 Mar 20261$8.5bn; A3 / A(low); SOFR+2.25%; March 2032
2731 IREN 10-K FY2026 — cost of revenue note27 Aug 20261AI Cloud electricity $4.5m; mining electricity $186.6m
3232 IREN 8-K exhibit — Microsoft contract3 Nov 20251~$9.7bn, five years, 20% prepayment, 200 MW IT, $5.8bn Dell purchase
3334 IREN 8-K exhibit — Q3 FY26 results7 May 20261$3.4bn NVIDIA contract, 60 MW; 5 GW partnership; 30m-share right
3035 IREN 10-K FY2026 — commitments note27 Aug 20261$13,810.0m commitments, $13,611.0m within 12 months; tariff and GST disputes
3836 Nebius 6-K — Microsoft agreement terms8 Sep 20251~$17.4bn to 2031, up to ~$19.4bn; delivery-failure termination right
4037 Nebius 6-K exhibit — Meta agreement16 Mar 20261$12bn committed + up to $15bn additional; Vera Rubin; from early 2027
1638 CoreWeave 10-Q Q3 2025 — statement of operations13 Nov 20251Q3 2025 revenue $1,364.7m; 9M $3,559.1m
1239 CoreWeave 10-K FY2025 — statement of operations2 Mar 20261FY2025 revenue $5,131m; net loss $1,167m
4540 Nebius 6-K exhibit — Q3 2025 resultsNov 20251Q3 2025 revenue $146.1m; 9M $302.1m
4641 Nebius Form 20-F 2025 — statement of operations30 Apr 20261FY2025 revenue $529.8m; $611.7m operating loss; $598.9m revaluation gain
4342 Nebius 6-K exhibit — June 2025 private placement2 Jun 20251$500m 2.00% 2029; $500m 3.00% 2031
4243 Nebius Form FWP — September 2025 convertibles10 Sep 20251$1,375m 1.00% 2030; $1,375m 2.75% 2032; $138.75 conversion price
4144 Nebius 6-K exhibit — March 2026 convertible closing20 Mar 20261$2,587.5m 1.250% 2031; $1,750m 2.625% 2033
345 CoreWeave 10-Q Q2 2026 — cash flow statement12 Aug 20261Operating cash flow, capex, debt proceeds, private placements
1946 CoreWeave 8-K — NVIDIA share purchase26 Jan 2026122,935,780 shares at $87.20 = $2bn; 5 GW collaboration framework
1347 CoreWeave 10-K FY2025 — accounting policies2 Mar 20261Six-year technology-equipment life; the 2023 change from five
1448 CoreWeave 10-K FY2025 — PP&E schedule2 Mar 20261Gross PP&E by class; the 85.09% technology-equipment share
649 CoreWeave 10-Q Q2 2026 — PP&E narrative12 Aug 20261Depreciation $1,400m in Q2; interest capitalised $79m
5750 Deep Quarry — useful lives of GPUs20263Burry's $176bn claim and Nvidia's four-to-six-year rebuttal
5951 Semafor — Microsoft declines $12bn CoreWeave option20 Mar 20253The unexercised option and its framing
4952 Oracle 8-K exhibit — FY2026 Q4 results20261RPO $638bn, up 363%; FY2026 IaaS revenue $18.1bn
4853 NVIDIA Form 13F-HR information table14 Aug 2026147,213,353 CoreWeave shares ($4.70bn); 1,190,476 Nebius shares ($329m)
5654 GPU street-price index10 Jul 20263H100, B200 and GB200 rental price dispersion across providers
6055 Sacra — Lambda IPO research20253Lambda revenue and margin; private-peer calibration
1056 CoreWeave 10-Q Q2 2026 — total debt obligations12 Aug 20261DDTL 4.0/5.0, 2031/2032 notes, EUR notes, 2032 converts
3457 IREN 8-K exhibit — business update20 Jul 20261$2.8bn of new contracts, ~4-year weighted term; ARR target raised to >$4bn
35IREN Forms 8-K of 11 May, 12 May, 26 May and 13 Aug 2026 (items text via EDGAR)20261$2.6bn convertible pricing; $1.6bn Dell purchase; Horizon 1 acceptance
3958 Nebius 6-K exhibit — Microsoft announcement8 Sep 20251Vineland, New Jersey site; delivery from 2025
4459 Nebius 6-K exhibit — August 2026 convertible offering19 Aug 20261$4.50bn proposed (2030 and 2034 series); exchange of 2029/2031 notes
47Nebius Form 20-F 2025 — Item 4 Business and Item 5 MD&A (text via EDGAR)30 Apr 20261Full-stack description; multi-tenant architecture; site geography
5360 CoreWeave IR — DDTL 4.0 close31 Mar 20262Arranger group; collateral description; rating detail
5861 Deep Quarry — depreciation of GPUs20263Amazon's 6→5 year change and its disclosed earnings effect
6162 Morningstar DBRS — CoreWeave DDTL 4.0 rating action31 Mar 20262A3 / A(low) on the ring-fenced DDTL 4.0 SPV; first investment-grade-rated GPU financing

§Not verified, and not load-bearing

The following could not be verified from a primary source in this work and therefore carries no conclusion anywhere in this brief. Each is listed with what was tried.

Evidence cutoff3 September 2026. Filings, releases and market data published after that date are not reflected. This sector reprices quarterly; treat every figure as dated.

AIR Research. This document is an internal structural assessment of business quality and competitive position. It is not investment advice, not a recommendation, and not a solicitation. The ranking grades the durability of three business models on the evidence available at the cutoff date; it expresses no view on any security's price. Derived figures are computed from the cited disclosures and their method is shown in the relevant figure caption.

Argue with this brief.

Every brief is built to be pushed on — corrections, counter-evidence and questions all land in the live thread, and they sharpen the next revision.

Discuss on X →

Read next

AI Infrastructure
The Data Center Wars: Inside the Buildout Reshaping America's Land, Power, and Politics | AIR Research
AI Infrastructure
NVIDIA (NVDA) — Where the AI-Infrastructure Profits Concentrate